USDA Design/Build Perimeter Security Enhancement Parking Lot 9: requirements and submission rules
13 requirements and 0 submission rules found in the solicitation documents for 124PCA27Q0002. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- None detected automatically: read the instructions to offerors.
Requirements
| ID | Requirement |
|---|---|
| R1 | The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. |
| R2 | Period for acceptance of offers. The Offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers. |
| R3 | The Contractor shall comply with the following FAR Clauses for Commercial Construction. |
| R4 | The maximum excavation area above the tunnel at any given time must be coordinated with WMATA. |
| R5 | At this time, we recommend that the Contractor presume that the work above the tunnel would be completed in three equal sections for pricing. |
| R6 | Acceptable pressurization of the grout and pressures on the station must be coordinated with WMATA. |
| R7 | Grout points should maintain a minimum distance of 5 feet from the metro station or as approved by WMATA. |
| R8 | The final LMG improvement program should be designed by the specialty LMG contractor. |
| R9 | Final design of low-mobility grout points should be completed by a specialty contractor. |
| R10 | All operations should be overseen by the Special Inspector of Record. |
| R11 | Deviations or areas of concerns should be immediately provided to the Geotechnical Engineer of Record for review and coordination. |
| R12 | Gravel fills should be placed in maximum 8-inch-thick lifts and each lift should be compacted with at least 4 passes of a vibratory plate compactor. |
| R13 | Granular fill above the gravel fills or to replace unsuitable subgrades should also be placed in maximum 8-inch-thick lifts but compacted using a double drum walk-behind trench roller and compacted to at least 95 percent of the material’s maximum dry density in accordance with ASTM D698. |
Recent awards in NAICS 237310
The newest federal contract awards in the same industry code from Department of Agriculture, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-07-15 | PRICE CONTRACTING INCForest Service · REPLACE AGING TIMBER BRIDGE WITH NEW STEEL BRIDGE WHICH INCLUDES GSR ABUTMENTS. | $545,292 |
| 2027-07-07 | YRU CONTRACTING INCForest Service · BORAH TRAILHEAD/CAMPGROUND RENOVATION - SALMON CHALLIS NATIONAL FOREST | $332,737 |
| 2027-06-15 | TK3, LLCForest Service · TURPIN MEADOW ROAD AGGREGATE FURNISH AND INSTALL | $147,400 |
| 2027-06-15 | BATTLE RIDGE BUILDERS, LLCForest Service · GAOA WARM SPRINGS TRAIL BRIDGE REPLACEMENT BITTERROOT NF | $112,999 |
| 2027-06-01 | ISLAND ENTERPRISES INCForest Service · GAOA 0CL STARRIGAVAN RECREATION AREA DEFERRED MAINTENANCE | $665,300 |
| 2027-06-01 | CUTTING EDGE CONTRACTORS INCForest Service · HTNF PAVEMENT AND REPAIR PROJECT | $298,825 |
Source: USAspending.gov, retrieved 2026-11-20. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.