TenderAxiom

TenderAxiom · Opportunities

Womble Work Center Fiber Optic Installation: requirements and submission rules

21 requirements and 3 submission rules found in the solicitation documents for 12445127Q0005. Use them as the start of your compliance matrix.

Solicitation number
12445127Q0005
Agency
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / NATIONAL FORESTS IN MISSISSIPPI
NAICS
238210
Set-aside
Small Business Set Aside - Total
Responses due
23 November 2026 (closed)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • ACKNOWLEDGEMENT OF AMENDMENTS OFFER (Must be fully completed by offeror) (The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) AMENDMENT NO.
  • The contractor shall submit electronic sets of the manufacturer's description of all "or equals" proposed materials specified.
  • Contractor shall submit an electronic operation and maintenance manual for all equipment supplied and any warranty registrations that were completed or need to be completed.

Requirements

IDRequirement
R1If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
R2Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking.
R3If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026.
R4The Contractor shall begin performance within 10 calendar days and complete it within 60 calendar days after receiving award, notice to proceed.
R5Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .
R6The contractor shall provide all materials, labor, equipment, tools, transportation, supervision, expertise, and other incidentals necessary, except as otherwise provided in the contract, to successfully complete the following work on National Forest
R7The contractor shall provide all labor, tools, equipment, and materials to perform the work listed below per the specification. A. Install two inch non metallic conduit and pull boxes from the Ranger Office to the Work Center 18 inches deep minimum. B. Install fiber optic cable from the Office network closet to the Work Center network closet. C. Backfill areas around conduit and pull boxes and disturbed areas to natural grade. D. Seed, fertilize, and mulch all disturbed areas in accordance with specifications below.
R8The contractor shall perform work in a manner that will protect the safety of public and employees.
R9The contractor shall perform the work between the hours of 8:00 AM and 4:30 PM Monday through Friday excluding Federal Holidays unless arrangements have been made with the COR.
R10The contractor shall furnish submittals on all items they intend to use including the brand names listed in the specifications. Submittals shall be made within fifteen (15) days prior to commencing any work that relates to a respective submittal.
R11All differences between the specifications or name brands listed shall be highlighted on the submittal noting all differences.
R12The Contractor shall provide workers with the necessary skills and knowledge to complete the work in an expert and competent manor even if this requires bringing in outside help such as factory representatives, subcontractors, or consultants.
R13The contractor shall remove all materials, construction debris as well as impacted vegetation from the site.
R14Provide materials and equipment which are the standard products of a manufacturer regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening.
R15Submit a certified list of qualified permanent service organizations for support of the equipment which includes their addresses and qualifications. These service organizations must be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
R16After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.
R17The backfill in the Work Center parking lot shall be washed rock to within 2 inches of the top of the asphalt with the top 2 inches to be approved asphalt patching material.
R18There shall be no rocks placed within 6” of any of the conduit or pull boxes. Such backfill shall have a finish grade consisting of 6” of topsoil.
R19The areas that are to be seeded shall have all rocks and debris with any dimension larger than 3 inches removed from the area.
R20Remove the certification from the bag of seed and give to the COR.
R21Mulching shall NOT be done in the presence of free-standing water.

Recent awards in NAICS 238210

The newest federal contract awards in the same industry code from Department of Agriculture, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-11-01BONNEVILLE CONTRACTING AND TECHNOLOGY GROUP LLCForest Service · EL YUNQUE NATIONAL FOREST - BARRIERS SYSTEM, ACCESS CONTROL & INTERCOM MAINTENANCE$53,400
2026-10-20HEARTS AND HANDS RESTORATIONS SERVICES INCForest Service · 0301 Q4 CON ENG INSTALL FIBER OPTIC NEW OUT. UPGRADE TELECOMMUNICATIONS INFRASTRUCTURE AT SIX SITES ON THE APACHE-SITGREAVES NATIONAL FORESTS IN EASTERN ARIZONA. THE PROJECT IS LOCATED ON THE ALPINE, $93,000
2026-10-05XLEAGLE LLCForest Service · THIS PROJECT IS FOR GENERATOR REPLACEMENT CONSTRUCTION SERVICES FOR THE CRANBERRY MOUNTAIN NATURE CENTER ON THE MONONGAHELA NATIONAL FOREST. WORK INCLUDES BUT IS NOT LIMITED TO REMOVAL AND DISPOSAL OF$42,994
2026-10-01SOUTHERN COMPUTER SYSTEMS, INC.Agricultural Research Service · INSTALL HSPD-12 COMPLIANT PHYSICAL ACCESS SYSTEM (EPACS MODERNIZATION PROJECT). THE ARS REQUISITION FOR THE ACCESS CONTROL (EPACS)/INTRUSION DETECTION SYSTEM MODERNIZATION PROJECT IS MISSION ESSENTIAL$444,209
2026-10-01ONEIDA COMMUNICATIONS, INC.Office of the Chief Financial Officer · REPLACEMENT OF CELLULAR REPEATER TO INCLUDE EQUIPMENT, 3 YEAR WARRANTY AND INSTALLATION AT NATIONAL CENTER FOR APPLIED PLANT PATHOLOGY BUILDING IN LAUREL, MARYLAND$237,164
2026-09-30MILL CREEK FIRELAKE JV 2 LLCAgricultural Research Service · ELECTRICAL SWITCHGEAR AND TRANSFORMER MAINTENANCE, NATIONAL BIO AND AGRO-DEFENSE FACILITY, MANHATTAN, KANSAS$841,640

Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.