12445127B0002 AZ Halfmoon Ranch House HVAC Installation: requirements and submission rules
21 requirements and 6 submission rules found in the solicitation documents for 12445127B0002. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Questions shall be submitted via email to adam.doyle@usda.gov and cc: charles.cotton@usda.gov and are due no later than November 30th, 2026.
- Bid Submittal Deadline: 12/07/2026, 1300 CT.
- ACKNOWLEDGEMENT OF AMENDMENTS OFFER (Must be fully completed by offeror) (The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) AMENDMENT NO.
- Bids submitted in response to this solicitation shall be furnished as specified below: The bids must include the following: a.
- A schedule for all work must be submitted to and approved by the Government prior to construction beginning.
- PART 2 – MANUFACTURER’S LITERATURE AND SHOP DRAWINGS 2.1 - Description The Contractor shall submit one copy of all submittals to the Government for approval on the items required herein.
Requirements
| ID | Requirement |
|---|---|
| R1 | SUBJECT LINE SHALL READ: SOLICITATION_12445127B0002 |
| R2 | The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, supervision, and safety measures necessary to complete this project. |
| R3 | *Payment and Performance Bonds MUST be Furnished if bid exceeds $35,000.00 |
| R4 | The Contractor shall begin performance within 10 calendar days and complete it within 60 calendar days after receiving award, notice to proceed. |
| R5 | Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . |
| R6 | The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. |
| R7 | The offeror agrees to furnish any required performance and payment bonds. |
| R8 | Therefore, to be considered responsive, contractors must submit pricing for all items. |
| R9 | The Offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers. |
| R10 | The bids must include the following: a. SF-1442, Solicitation, Offer & Award, Pages 1 and 2 b. Acknowledgement of solicitation amendments (if any). This can be accomplished by submitting the signed SF-30(s). c. Attachment 003 Schedule of Items Fillable |
| R11 | The Contractor shall notify the Forest Service three (5) days in advance of any survey work and seven (14) days in advance of any construction work. |
| R12 | The Contractor shall clearly stake limits of construction and maintain marks throughout construction. |
| R13 | It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow 5 days for processing of submittals by the Government. |
| R14 | Certificates of compliance are required for the following: 1. HVAC Ductless Split Unit System 2. Programmable Thermostat |
| R15 | All facilities and materials scheduled for demolition must be completely removed off Government lands and disposed of legally by the Contractor. |
| R16 | The systems shall be equipped with wall mounted digital thermostats. The systems shall have a certified Energy Star Rating and a minimum 20 SEER. System sizing requirements are estimated and the Contractor shall field verify all dimensions, sizes and quantities prior to ordering materials. |
| R17 | 1.2 – Submittals: A. Manufacturers Product Data: Include rated capacities, furnished specialties, and accessories for each unit indicated. Include performance data in terms of capacities, outlet velocities, static pressures, sound power characteristics, motor requirements, and electrical characteristics. B. Wiring Diagrams: Power, signal, and control wiring. C. Operation and maintenance data. |
| R18 | All electrical work shall be completed by an electrician in accordance with all State and Local electrical codes. |
| R19 | All penetrations through walls shall be sealed with approved fire sealer. |
| R20 | Installation Inspection: Engage a factory -authorized service representative to inspect field-assembled components and equipment installation, including piping and electrical connections, and to prepare a written report of inspection. |
| R21 | Leak Test: After installation, charge system and test for leaks. Repair leaks and retest until no leaks exist. |
Recent awards in NAICS 238220
The newest federal contract awards in the same industry code from Department of Agriculture, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-11-16 | WILLIAMS DIVERSIFIED LLCForest Service · 0412 CONST FOREST-WIDE HVAC REPAIRS/UPGRADES FY26 | $35,517 |
| 2026-10-20 | SCHMOLCK MECHANICAL CONTRACTORS INC.Forest Service · TNF MECHANICAL MAINTENANCE - OVER AND ABOVE WORK TASK ORDER FOR HVAC REPAIRS AT CRD | $14,395 |
| 2026-10-16 | GREENSTONE CONSTRUCTION, INC.Forest Service · THIS PROJECT WILL ADD A SECOND FUME HOOD IN NEWLY RENOVATED LAB 230 TO ACCOMMODATE NEW RESEARCH. | $88,167 |
| 2026-10-12 | SPRINGFIELD SOLUTIONS LLCForest Service · CTNF SODA SPRINGS DISTRICT OFFICE HVAC MODIFICATIONS | $15,430 |
| 2026-10-12 | EZ CONTRACTOR GROUPForest Service · I. CONTRACTOR WILL REMOVE AND DISPOSE OF EXISTING OUTDOOR A/C UNIT AND COILS AH 5 MODEL# H1DA024S06A, SERIAL# EFAM239778 AND AH 6 MODEL # H1D076S46A SERIAL # ENCM613011. II. CONTRACTOR WILL INSTALL NE | $52,733 |
| 2026-10-05 | SILVERBACQ LLCForest Service · 127EAW26P0048 - KERN RIVER RANGER DISTRICT HVAC | $456,500 |
Source: USAspending.gov, retrieved 2026-11-03. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.