TenderAxiom

TenderAxiom · Opportunities

12445127B0001 AZ Lakeside Office Sewer Line Replacement: requirements and submission rules

27 requirements and 4 submission rules found in the solicitation documents for 12445127B0001. Use them as the start of your compliance matrix.

Solicitation number
12445127B0001
Agency
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA-FS, CSA EAST 11
NAICS
237110
Set-aside
Small Business Set Aside - Total
Responses due
14 December 2026 (16 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Questions shall be submitted via email to adam.doyle@usda.gov and cc: charles.cotton@usda.gov and are due no later than November 30th, 2026.
  • Bid Submittal Deadline: 12/14/2026, 1300 CT.
  • ACKNOWLEDGEMENT OF AMENDMENTS OFFER (Must be fully completed by offeror) (The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) AMENDMENT NO.
  • Bids submitted in response to this solicitation shall be furnished as specified below: The bids must include the following: a.

Requirements

IDRequirement
R1Submittal Method: All proposals will be emailed to adam.doyle@usda.gov and cc charles.cotton@usda.gov SUBJECT LINE SHALL READ: SOLICITATION_12445127B0001
R2The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, supervision, and safety measures necessary to complete this project.
R3The Contractor shall begin performance within 10 calendar days and complete it within 30 calendar days after receiving award, notice to proceed.
R4THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? YES within 10 calendar days after award.
R5Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .
R6Therefore, to be considered responsive, contractors must submit pricing for all items.
R7The Offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.
R8The bids must include the following: a. SF-1442, Solicitation, Offer & Award, Pages 1 and 2 b. Acknowledgement of solicitation amendments (if any). This can be accomplished by submitting the signed SF-30(s). c. Attachment 003 Schedule B Fillable d. Scanned copy of fully executed Bid Guarantee (Standard Form 24 and Power of Attorney)
R9The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
R10The Contractor shall comply with the following FAR Clauses for Commercial Construction. 52.222-6 Construction Wage Rate Requirements (Nov 2025) 52.222-7 Withholding of Funds (Nov 2025) 52.222-8 Payrolls and Basic Records (Nov 2025) 52.222-9 Apprentices and Trainees (Nov 2025) 52.222-10 Compliance with Copeland Act Requirements (Nov 2025) 52.222-11 Subcontracts (Labor Standards) (Nov 2025) 52.222-12 Contract Termination-Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (May 2014) 52.222-14 Disputes Concerning Labor Standards (Nov 2025) 52.222-15 Certificate of Eligibility (May 2014) 52.236-5 Material and Workmanship (Jul 2025)
R11Furnish and install new sewer service pipe sized per PLSD standards (minimum 4-inch diameter unless otherwise required). Pipe materials shall comply with PLSD specifications (typically SDR-35 PVC or approved equivalent).
R12Construct trench per industry standard excavation practices including: Proper bedding material per ASTM D2321; Uniform pipe support along the trench bottom; Backfill in compacted lifts using approved materials
R13Maintain proper slope (minimum 2% unless otherwise approved) from building to public main.
R14Install new cleanouts at locations required by PLSD, including a property-line cleanout where applicable.
R15Coordinate tap or connection activities directly with PLSD staff. Perform main connection using approved saddle tap, wye, or factory-built fitting per PLSD construction detail sheets. Notify PLSD a minimum of 48 hours in advance of connection work. No connection will be made without a PLSD representative onsite.
R16Provide bypass pumping or temporary sanitary facilities as required to maintain uninterrupted service to the district office during construction. Bypass systems must prevent any sanitary sewer overflow (SSO) and comply with PLSD requirements.
R17Restore asphalt, concrete, sidewalks, landscaping, and any other disturbed surfaces to pre-construction conditions or better. Pavement replacement shall match existing structural section thickness and materials.
R18Coordinate Arizona 811 locates prior to excavation. Protect all existing utilities; repair any damages at the contractor’s expense. Maintain required horizontal and vertical separations between sewer facilities and water, gas, communication, or other utilities.
R19The Contractor shall: • Obtain and maintain all required construction permits, including right-of-way or encroachment permits if working in public roadway. • Schedule preconstruction meeting with PLSD and the Owner prior to mobilization. • Provide PLSD all required submittals and notifications. • Maintain traffic control per MUTCD standards if working near a roadway.
R20The following tests and inspections are required prior to acceptance: • Low-pressure air test or hydrostatic test per PLSD standards • Mandrel (deflection) testing for flexible pipe • CCTV video inspection of the completed line from building to PLSD main • Visual inspection of all joints, cleanouts, and fittings • Final inspection by PLSD and Owner’s representative. No backfill shall occur prior to inspection unless otherwise approved.
R21Contractor shall provide: • Product data for pipe, fittings, bedding, and appurtenances • Proposed trench safety plan • Traffic control plan (if applicable) • Construction schedule • As-built drawings showing final alignment, depth, and component locations • Test reports and CCTV footage
R22Comply with OSHA trench safety requirements including shoring, shielding, or benching as appropriate. Maintain secure work zones and safe pedestrian access. Implement sediment and erosion control measures to prevent offsite discharge.
R23Implement best management practices (BMPs) to protect stormwater systems. Properly manage and dispose of any contaminated soils or groundwater encountered. Stop work and notify the Owner if cultural or archaeological materials are discovered.
R24Have semke he andrequired fittiugs completelyiastalled, iac1udm.g beddrag, and uncovered at time of inspection. Slope ofpzpe will ako be versed, Request a time and date for a construction inspection at least 48 hours before it is needed. If inspection must be rescheduled for any reason, no* the District at least 24 hours prior to the requested inspection time and date or pay an additional inspection fee. Correct all defects found dudng inspection and request a re-inspection date and time. Sign contractor checklist Give onginal sewer permit to the District inspector. Homeowner or contractor must be present for inspection.
R25No pipe shall be exposed for more than 48 hours prior to or after inspection.
R26Cutting or tapping into a District sewer main shall only be done by District personnel.
R27Where disposal faalities are abandoned consequent to connecting any premises with the public sewer, the permittee makmg the connection shall £ill all abandoned fadlrties as required by the Authority Having Jurisdiction within duty (30) days from the time of connecting the public sewer.

Recent awards in NAICS 237110

The newest federal contract awards in the same industry code from Department of Agriculture, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2027-06-01WIGGINS EXCAVATION LLCForest Service · INSTALLING UTILITIES AND TRAILER PADS FOR A FOREST SERVICE BUNKHOUSE FACILITY$111,330
2026-11-01KING GENERAL CONTRACTORS, INC.Forest Service · GAOA SHERANDO RECREATION AREA REHABILITATION, GEORGE WASHINGTON-JEFFERSON NATIONAL FOREST.$6.40 million
2026-11-01AMG CONSTRUCTION COMPANY, INCORPORATEDForest Service · DEMOLITION AND REPLACEMENT OF SEWER LINE AND ASSOCIATED APPURTENANCES WITHIN FOREST SERVICE OWNED FACILITY AT THE BIG PINEY DISTRICT RANGER'S OFFICE.$135,775
2026-10-29GRANITE GROUP, LLCForest Service · AWARD - NEMO DOMESTIC WELL NORTHERN HILLS RANGER DISTRICT, BLACK HILLS NF, SOUTH DAKOTA$85,150
2026-10-26EMPIRE PUMP CORPForest Service · DECOMMISSION WELLS PER ADWR AND SEPTIC TANKS PER ADEQ REGULATIONS.$149,725
2026-10-05VICTORY CONTRACTING LLCForest Service · CONTRACT FOR DEVELOPMENT AND CONSTRUCTION OF A POTABLE WATER WELL AT THE LAKE CONASAUGA CAMPGROUND (GA EPD SYSTEM GA2130026). WORK SHALL BE COMPLETED BY A CONTRACTOR LICENSED IN THE STATE OF GEORGIA.$93,500

Source: USAspending.gov, retrieved 2026-11-03. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.