Administrative Parking Lot Repairs: requirements and submission rules
29 requirements and 8 submission rules found in the solicitation documents for 1240LT27Q0019. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- All questions and quotes relating to this Solicitation shall be submitted to Contract Specialist, Jordan Carlsen at Jordan.Carlsen@usda.gov by the deadlines stated above.
- In the submission of your quote, include in the email’s subject line: Solicitation Quotes shall be no more than 3 pages, NOT including the Schedule of Items.
- Parking Lot Renovation 1240LT27Q0019 Page 13 of 15 A ll individual line-item pricing provided shall be rounded up to the nearest whole dollar, do not include cents, the total pricing should equate to the individual line-item amounts. E nsure the name of the company and the UEI number is added to the top of the Schedule of Items (Vendor name and UEI block highlighted in yellow).
- QUOTES DUE: Please submit your quote no later than November 23rd, 2026, at 14:00 Eastern Standard Time (EST).
- ACKNOWLEDGEMEN T OF AMENDMENTS OFFER (Must be fully completed by offeror) (The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) AMENDMENT NO.
- Offerors shall use Times New Roman Font 12 on 8 x 11 size paper.
- ACKNOWLEDGEMENT OF AMENDMENTS TO THE SOLICITATION: Offerors shall acknowledge all amendments in Block 19 of the SF-1442, at the time of offer, failure to do so will result in the rejection of your offer.
- QUESTIONS DUE: Questions shall be submitted to via email to the Contracting Specialist, Jordan Carlsen at Jordan.Carlsen@usda.com.
Requirements
| ID | Requirement |
|---|---|
| R1 | Offers providing less than 30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . |
| R2 | Submit the following documents below with your quote: 1. Technical Approach documentation 2. Pricing documentation – Use the Schedule of Items Attachment 1 – C05 Schedule of Items to input pricing for the Base Items |
| R3 | Therefore, to be considered responsive, contractors must submit pricing for all items. |
| R4 | The Contractor is required to commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed and complete the entire work area no later than August 15th 2027. |
| R5 | The Contractor shall submit one of the following payment protections: (1) Payment Bonds (2) Irrevocable Letter of Credit |
| R6 | The amount of the payment protection shall be 100% of the contract price. |
| R7 | The submission of the payment protection is required within 10 days of contract award. |
| R8 | The payment protection shall provide protection for the full contract performance period plus a one-year period. |
| R9 | Payment Bond must be submitted using the mandatory Standard Form (SF) 25A. Please note that no substitute forms will be accepted. |
| R10 | The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers. |
| R11 | All offerors must provide the following, minimum, information and documentation with their quotations to be considered responsive and have their offers evaluated: A detailed 1–3-page narrative of the offeror's technical approach; this must include an execution plan outlining how they will accomplish the scope of work in accordance with the Statement of Work (SOW), drawings, and/or technical specifications. A simple statement of capabilities will not suffice. The offeror must address how it will accomplish the requirements of the SOW addressing • Key tasks • Milestones and • Demonstrate a thorough understanding of the project. |
| R12 | Offerors shall include a Construction Schedule (such as a Gantt Chart) illustrating the project’s schedule for the work to be completed and key tasks all within the estimated Period of Performance for this contract. |
| R13 | Schedule of Items - All items shall be priced and submitted on the Excel Spreadsheet provided, Attachment 1 – C05 Schedule of items. Do not submit pricing in Adobe format. |
| R14 | Place excess material at government-approved agreed to location(s), at no additional cost to government. |
| R15 | If there is evidence that a quantity specific as a contract quantity is incorrect by 15% or more, submit calculations, drawings, or other evidence indicating why the quantity is in error and request in writing that the quantity be adjusted. |
| R16 | The primary component of seal materials shall be slow setting asphalt emulsion that conforms to either AASHTO M140 or M208. The contractor shall submit a manufacturer’s certificate of compliance with each shipment of asphalt emulsion. Asphalt emulsions shall be mixed with additives that prevent bleeding. |
| R17 | If the seal material is blended with sand, the sand shall be clean, hard, durable, un-coated particles, free from clay lumps and organic matter, with 100 percent passing the No. 16 mesh and a maximum of 5 percent passing the No. 200 mesh. The sand must have a gradation that helps control segregation and promotes suspension during product application. No more than 3 pounds of sand shall be added to each gallon of applied material. |
| R18 | Submit proposed emulsion mix for approval 14 days prior to production. |
| R19 | Clean the existing surface to be sealed of all loose material, dirt, dust, oil or any type of objectionable surface film that might jeopordize adhesion and a quality final product. |
| R20 | Apply the sealcoat when the air temperature in the shade and the surface temperature are at least 45o F and rising and when the weather is not foggy, rainy, or overcast. Do not apply when there is a danger of freezing within 24 hours. |
| R21 | Seal material Application shall be spread in two directions, 180 degrees from each other. |
| R22 | The minimum ‘residue’ application rate of 1.0 pound per square yard shall be obtained over the entire surface to be treated. |
| R23 | Allow treated areas to completely cure before opening to traffic.Traffic control and the prevention of asphalt pickup under traffic is the contractor's responsibility for 10 days following treatment. |
| R24 | After the treatment has been open to traffic for 10 days, the contractor shall repair any areas that are damaged by traffic, or areas that are peeling or cracking. |
| R25 | Samples will be taken by the contractor as directed by and delivered to the CO in approved plastic 1 gallon containers. A minimum of 3 samples per project will be required on all projects. |
| R26 | All work must be completed as specified in the included Forest Service Supplementary Specifications (FSSS) and the Federal Highways Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-24. |
| R27 | Reporting Requirements: The contractor is required to provide written progress reports weekly for the period duration of the project. The progress report shall cover all work completed during the specified period and shall present the work to be accomplished during the subsequent period. This report shall also identify any problems that arose and a statement explaining how the problem was resolved. This report shall also identify any problems that have arisen but have not been completely resolved and provide an explanation. |
| R28 | Submittals: The contractor shall provide submittals for all asphalt products as specified in the supplemental and standard specifications. |
| R29 | Schedule: Work shall be completed within one week at each site. |
Recent awards in NAICS 237310
The newest federal contract awards in the same industry code from Department of Agriculture, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-07-15 | PRICE CONTRACTING INCForest Service · REPLACE AGING TIMBER BRIDGE WITH NEW STEEL BRIDGE WHICH INCLUDES GSR ABUTMENTS. | $545,292 |
| 2027-07-07 | YRU CONTRACTING INCForest Service · BORAH TRAILHEAD/CAMPGROUND RENOVATION - SALMON CHALLIS NATIONAL FOREST | $332,737 |
| 2027-06-01 | CUTTING EDGE CONTRACTORS INCForest Service · HTNF PAVEMENT AND REPAIR PROJECT | $273,075 |
| 2027-06-01 | NORTERRA SERVICES LLCForest Service · SELWAY SUSPENSION BRIDGE RECONSTRUCTION | $249,000 |
| 2027-06-01 | PRICE CONTRACTING INCForest Service · PRIEST PASS ROAD RECONSTRUCTION | $141,474 |
| 2027-06-01 | GILBERT AND SONS CONSTRUCTION LLCForest Service · NFSR 27 ASPHALT REPAIRS TASK ORDER UNDER WESTERN OREGON ROAD CONSTRUCTION IDIQS | $144,305 |
Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.