GAOA Brainard Lake Recreation Area Deferred Maintenance: requirements and submission rules

79 requirements and 0 submission rules found in the solicitation documents for 1240LT27Q0004. Use them as the start of your compliance matrix.

Solicitation number
1240LT27Q0004
Agency
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
NAICS
237310
Set-aside
Small Business Set Aside - Total
Responses due
17 December 2026 (19 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • None detected automatically: read the instructions to offerors.

Requirements

IDRequirement
R1No work shall happen on weekends or Federally recognized Holidays.
R2Work shall be allowed during daylight hours.
R3Contractor shall install and maintain suitable barriers to ensure the protection of the public, employees, and facilities.
R4All signs shall meet MUTCD standards.
R5Contractor may be allowed to temporarily close or block off traffic, with prior approval from the Contracting Officer, for the safety of the public.
R6Contractor shall be in compliance with current OSHA 1910 and 1926 regulations and requirements.
R7Any sub-contractors shall be under the superintendence by the Prime.
R8All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and testing at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
R9The contractor is responsible for adhering to the contract specifications and for quality control.
R10The Contractor shall furnish all management, labor, equipment, supervision, tools, materials, transportation, operating supplies, supervision, workman’s compensation, unemployment insurance and incidentals necessary to perform the work in accordance with the specification and provisions of the contract.
R11All Contractors shall visit the project sites and acquaint themselves with current conditions prior to submitting a bid for these services.
R12Large boulders or rock material shall remain on-site unless otherwise directed by the Contracting Officer.
R13The contractor shall be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, County, and Municipal laws, codes, and regulations applicable to the performance of the work.
R14The contractor shall be responsible for all damages to persons or property, which occur as a result of the Contractor’s performance or negligence.
R15ALL WORK TO CONFORM TO FOREST SERVICE, STATE, AND COUNTY CODES, LAWS, AND REGULATIONS.
R16CONTRACTOR SHALL COORDINATE ACTIVITIES WITH AFFECTED UTILITY COMPANIES AND SHALL NOTIFY THE UTILITY NOTIFICATION CENTER (811) AT LEAST 48 HOURS PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
R17ALL CONSTRUCTION ACTIVITIES SHALL BE IN COMPLIANCE WITH CURRENT INTERNATIONAL BUILDING CODES AND STATE OF COLORADO ON-SITE WASTEWATER REGULATIONS.
R18CONTRACTOR IS RESPONSIBLE FOR NOTIFYING CONTRACTING OFFICER (CO) 72 HOURS IN ADVANCE OF ANY POTENTIAL DISRUPTIONS TO UTILITY SERVICES OR PROGRAMMED VISITOR ACTIVITIES.
R19CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT ADJACENT PUBLIC AND PRIVATE LANDS FROM STORMWATER RUN-OFF OR DEBRIS AND EXCESSIVE DUST.
R20CONTRACTOR SHALL REMOVE ANY MUD OR CONSTRUCTION TRACKED ONTO TRAILS, PARKING LOTS OR ROADWAYS WITHIN 24 HOURS.
R21LAYOUT AND ALIGNMENT OF ALL PAVING SURFACES TO BE FIELD STAKED BY CONTRACTOR AND APPROVED BY CO PRIOR TO FORM INSTALLATION.
R22ALL SURFACE CONCRETE SHALL HAVE A MEDIUM BROOM FINISH WITH TOOLED EDGES.
R23CONTRACTOR TO PROVIDE ALL TEMPORARY BRACING, SUPPORTS, SHORING, ETC. AS NEEDED FOR CONSTRUCTION AND PER ALL LOCAL CODES.
R24DO NOT SCALE OR DIGITIZE FROM HARD COPY DRAWINGS.
R25CONTRACTOR TO VERIFY ALL QUANTITIES.
R26GRADES OF PAVED AND REVEGETATED AREAS TO PROVIDE SMOOTH SLOPE TRANSITIONS AS INDICATED. NOTIFY CO OF ANY CONFLICTS IMMEDIATELY.
R27MAXIMUM LONGITUDINAL AND CROSS SLOPES TO BE AS INDICATED. NOTIFY CO IMMEDIATELY OF ANY CONFLICTS.
R28ALL ACCESSIBLE ROUTES SHALL ADHERE TO ALL FEDERAL ACCESSIBILITY GUIDELINES (FSORAG, ABA, ETC.)
R29CONTRACTOR IS RESPONSIBLE FOR VERIFYING SITE CONDITIONS PRIOR TO COMMENCING DEMOLITION. NOTIFY CONTRACTING OFFICER (CO) IMMEDIATELY OF ANY CONFLICTS OR CONDITIONS THAT VARY FROM THE INFORMATION PROVIDED.
R30CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, ADJACENT BUILDINGS, FOUNDATIONS WALLS, CURBS, AND ABOVE AND BELOW GROUND UTILITIES. ANY DAMAGE TO FINISH OR FOOTINGS TO BE REPAIRED BY CONTRACTOR AT CONTRACTOR'S EXPENSE.
R31TREE PROTECTION MEASURES TO BE IN PLACE PRIOR TO COMMENCING DEMOLITION.
R32WITHIN THE DRIP LINE OR ZONE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER FOUR-INCH DEPTH.
R33NO TREE DAMAGING ATTACHMENTS, WIRES, SIGNS, OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE.
R34THE INSTALLATION OF UTILITIES, OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOT SYSTEM OR PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES.
R35CONTRACTOR TO FIELD LOCATE PERIMETER FENCING FOR DEMOLITION OPERATIONS FOR CO APPROVAL PRIOR TO COMMENCING DEMOLITION. ANY AREA NEEDED FOR TEMPORARY STOCKPILING OF REMOVED MATERIALS SHALL BE SECURELY FENCED AND AND THE LOCATION APPROVED BY THE CO.
R36CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF ALL EXCESS MATERIALS.
R37FOR EXCAVATION/DEMOLITION OCCURRING DIRECTLY ADJACENT TO ANY FOOTINGS, CONTRACTOR TO SHORE OR SECURE FOOTINGS TO PREVENT EROSION OF SUB-GRADE MATERIAL.
R38UPON REMOVAL OF ALL ITEMS, ALL IMPACTED ARES TO BE FILLED, AMENDED AND COMPACTED AS REQUIRED BY EACH TYPE OF NEW CONSTRUCTION.
R39TREE REMOVAL TO INCLUDE COMPLETE ROOTBALL REMOVAL AND REMOVAL OF LARGE ROOTS OVER 2-INCHES IN DIAMETER.
R40CURB, GUTTER AND SIDEWALK SHALL BE REMOVED TO NEAREST JOINT.
R41ALL SAWCUTS TO BE IN STRAIGHT LINES ACCORDING TO PLANS.
R42CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT.
R43CONTRACTOR TO PROVIDE PROPOSED TEMPORARY FENCING PLAN TO PROVIDE SUFFICIENT SPACE FOR CONSTRUCTION OPERATIONS WHILE MAINTAINING SAFE ACCESS TO OTHER NATIONAL FOREST USE AREAS.
R44ALL MATERIALS TO BE REMOVED SHALL BE DISPOSED OF OR RECYCLED AT AN APPROVED FACILITY OFF NATIONAL FOREST SYSTEM LANDS.
R454" IN DIAMETER OR LARGER TREE ROOT OR DRIP ZONES SHALL BE AVOIDED DURING CONSTRUCTION UNLESS OTHERWISE APPROVED. CONTRACTOR SHALL FLAG TREES NEEDING TO BE REMOVED AND CONTRACTING OFFICER SHALL APPROVE PRIOR TO REMOVAL.
R46ALL EXISTING HISTORIC CCC ELEMENTS WILL REMAIN AND MUST BE PROTECTED DURING CONSTRUCTION.
R47CONTRACTOR SHALL PROTECT EXISTING ASSETS AND INFRASTRUCTURE SET TO REMAIN AND BE PROTECTED.
R48CONTRACTOR TO STAKE IN FIELD ALL SIGN LOCATIONS AND SHALL BE APPROVED BY CONTRACTING OFFICER BEFORE INSTALLATION.
R49ALL SIGNS TO BE FURNISHED AND INSTALLED IN ACCORDANCE WITH FOREST SERVICE SIGN & POSTER GUIDELINES (EM-7100) AND MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
R50CONTRACTOR SHALL FURNISH AND INSTALL ALL NEW SIGNS. SIGN DESIGNS AND LAYOUTS SHALL BE APPROVED BY THE C.O. PRIOR TO SIGN INSTALLATION.
R51BARRIER ROCKS SHALL BE A MINIMUM OF 3'-0" IN DIAMETER, WITH LARGER ROCKS PLACED NEXT TO STEPS OR AT CORNERS.
R52BARRIER ROCKS SHALL BE EMBEDDED 13 TO 12 INTO THE PROPOSED SLOPE IN FRONT OF THE AGGREGATE SIDEWALK AND INTERLOCKED OR OVERLAPPED WITH EACH OTHER AS TO PREVENT ANY MOVEMENT OR ROLLING.
R53BARRIER ROCKS FOR THE WALL SHALL BE FROM A COMMERCIAL SOURCE. THE COLOR AND SIZE SHALL MIMIC LOCAL ON-SITE GEOLOGY AND BE SHALL BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO INSTALLATION.
R54IMPORTED FILL SHALL BE APPROVED BY THE C.O.
R55LANDINGS ARE REQUIRED EVERY 30" OF RISE MINIMUM.
R56REBAR SHALL BE EPOXY COATED AND DRIVEN DOWN 1" MIN FROM TOP OF TIMBERS.
R576"x6" SOFT WOOD LUMBER SHALL BE PRESSURE TREATED GRADE #1. A LIGHT BROWN COLOR MAY BE ADDED TO THE TREATMENT.
R58SAW CUT ENDS SHALL BE RETREATED.
R59FASTEN CORNERS OF TIMBER END LAPS W/ (QTY. 3) GALVANIZED 6" LONG HELIX SPIRAL SPIKES, WHEN REBAR IS NOT USED TO SECURE END LAPS.
R60CURVED STAIRWAYS SHALL HAVE A MINIMUM OF 1'-6" LANDING AT ITS NARROWEST POINT.
R61TRAIL ALIGNMENT SHALL BE STAKED IN THE FIELD BY THE CONTRACTOR AND APPROVED BY THE CONTRACTING OFFICER.
R62CLEARING LIMITS SHALL EXTEND 2 FEET HORIZONTALLY BEYOND THE EDGE OF THE TRAILBED AND 8 FEET VERTICALLY.
R63ALL TREES 4 INCHES IN DIAMETER OR LARGER SHALL BE CUT IF THEY ARE WITHIN 3 FEET OF TRAIL CENTERLINE ON EITHER SIDE.
R64DO NOT CUT ANY TREES IF THEY ARE 4 FEET OR FURTHER AWAY FROM TRAIL CENTERLINE ON EITHER SIDE.
R65BRUSH EXTENDING INTO THE CLEARING LIMITS THAT ARE 12 INCHES IN LENGTH AND 12" IN DIAMETER SHALL BE CUT FLUSH WITH THE MAIN STEM AT THE BRANCH FORK OR AT GROUND LEVEL IF A FORK MAIN STEM IS NONEXISTENT.
R66AT THE END OF EACH DAY'S WORK, THE APPROPRIATE COMBINATION OF TEMPORARY EROSION CONTROL MEASURES WILL BE PLACED FOR EACH DRAINAGE SECTION UNDER CONSTRUCTION.
R67BALES FOR EROSION CONTROL STRUCTURES SHALL BE EXCELSIOR, COCONUT FIBER AND CERTIFIED WEED FREE OR APPROVED EQUAL.
R68SCARIFY FINISH GRADE AND RESEED SLOPE BEFORE INSTALLING EROSION BLANKET.
R69INSTALL 6" - 8" LONG HEAVY DUTY FABRIC PINS EVERY 24" O.C.. OVERLAY EROSION BLANKET AS REQUIRED BY MANUFACTURERS DIRECTIONS.
R70THOROUGHLY WATER SLOPE AFTER BLANKET IS INSTALLED.
R71ALL POSTS SHALL BE BURIED A MINIMUM OF 3'-0" UNLESS OTHERWISE APPROVED BY THE CONTRACTING OFFICER.
R72ALL POSTS SHALL BE ROUGH SAWN CEDAR POSTS.
R73ALL HARDWARE SHALL BE HOT DIPPED GALVANIZED FINISH UNLESS OTHERWISE APPROVED BY THE CONTRACTING OFFICER.
R74BARRIER ROCK LOCATIONS SHALL BE STAKED IN THE FIELD BY THE CONTRACTOR AND APPROVED BY THE CO.
R75PLACEMENT OF ROCKS SHALL BE IN A TRIANGULAR SHAPE WHERE ROCKS ARE PLACED IRREGULARLY, NOT IN A STRAIGHT LINE, AND OF DIFFERING SPACES BETWEEN.
R76ROCK SIZE SHALL BE 3'-0" MIN. AND 5'-0" MAX. IN ANY ONE DIRECTION. VOLUME SHALL BE APPROXIMATELY 14 CUBIC FEET EACH, UNLESS OTHERWISE APPROVED BY CO.
R77LIVE TREES SHALL BE PROTECTED DURING BARRIER ROCK INSTALLATION UNLESS OTHERWISE DIRECTED BY CO.
R78If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
R79If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026.

Recent awards in NAICS 237310

The newest federal contract awards in the same industry code from Department of Agriculture, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2027-07-15PRICE CONTRACTING INCForest Service · REPLACE AGING TIMBER BRIDGE WITH NEW STEEL BRIDGE WHICH INCLUDES GSR ABUTMENTS.$545,292
2027-07-07YRU CONTRACTING INCForest Service · BORAH TRAILHEAD/CAMPGROUND RENOVATION - SALMON CHALLIS NATIONAL FOREST$332,737
2027-06-01CUTTING EDGE CONTRACTORS INCForest Service · HTNF PAVEMENT AND REPAIR PROJECT$273,075
2027-06-01NORTERRA SERVICES LLCForest Service · SELWAY SUSPENSION BRIDGE RECONSTRUCTION$249,000
2027-06-01PRICE CONTRACTING INCForest Service · PRIEST PASS ROAD RECONSTRUCTION$141,474
2027-06-01GILBERT AND SONS CONSTRUCTION LLCForest Service · NFSR 27 ASPHALT REPAIRS TASK ORDER UNDER WESTERN OREGON ROAD CONSTRUCTION IDIQS$144,305

Source: USAspending.gov, retrieved 2026-10-29. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.