GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest: requirements and submission rules
116 requirements and 15 submission rules found in the solicitation documents for 1240BH27Q0002. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- The Contractor shall submit to the Contracting Officer, for approval, laboratory certification or inspection information.
- Certification The supporting data submitted to the engineer shall include the name of the manufacturer, the manufac- turer's model number (for standard catalogue items), or the seating and unseating heads for which the gate is designed together with such drawings and specifica- tions as may be necessary to show that the gate con- forms to the requirements of this specification.
- An access plan shall be submitted in writing prior to beginning construction.
- A resume detailing the experience of the PLS and the crew chief shall be submitted to the Engineer.
- The Contractor is required to submit a dewatering plan for review by the Engineer.
- Revisions or changes in a job mix that are determined to be significant by the engineer shall follow the same submittal and acceptance process as that for the initial job mix.
- This written batching and mixing plan shall be submitted to the engineer for review and approval not less than 10 working days before the placement of concrete.
- This report must be submitted no less than 30 calendar days before placing concrete by this method.
- The repair plan shall be submitted to the engineer for review at least 10 days before any repair or replacement work.
- Bar schedules, lists and diagrams for the structures shall be submitted to the Engineer at least fifteen (15) days before delivery of the steel to the project site.
- The identification of the quality control personnel and their duties and authorities shall be submitted to the contracting officer in writing within 15 calendar days after notice of award.
- The Contractor shall submit to the Contracting Officer, for approval, the names, qualifications, authorities, certifications, and availability of the competent personnel who will perform the quality control activities.
- Unless otherwise specified in section 10, the original plus one copy of all records, inspections, tests performed, and material testing reports shall be submitted to the engineer within one working day of completion.
- The original plus one copy of documentation of material delivered shall be submitted to the engineer before the material is used.
- The location shall be proposed and submitted to the Contracting Officer if not shown on the drawings.
Requirements
| ID | Requirement |
|---|---|
| R1 | Trees and other vegetation designated to remain undisturbed shall be protected from damage throughout the duration of the construction period. Any damages resulting from the contractor's operations or neglect shall be repaired by the contractor. |
| R2 | Earthfill, stockpiling of materials, vehicular parking, and excessive foot or vehicular traffic shall not be allowed within the drip line of vegetation designated to remain in place. Vegetation damaged by any of these or similar actions shall be replaced with viable vegetation of the same species, similar condition, and like size unless otherwise approved by the contracting officer. |
| R3 | Any cuts, skins, scrapes, or bruises to the bark of the vegetation shall be carefully trimmed and local nursery accepted procedures used to seal damaged bark. |
| R4 | Any limbs or branches 0.5 inch or larger in diameter that are broken, severed, or otherwise seriously damaged during construction shall be cut off at the base of the damaged limb or branch flush with the adjacent limb or tree trunk. All roots 1-inch or larger in diameter that are cut, broken, or otherwise severed during construction operations shall have the end smoothly cut perpendicular to the root. Roots exposed during excavation or other operations shall be covered with moist earth or backfilled as soon as possible to prevent the roots from drying out. |
| R5 | All trees not marked for preservation and all snags, logs, brush, stumps, shrubs, rubbish, and similar materials shall be cleared from within the limits of the designated areas. Unless otherwise specified, all stumps, roots, and root clusters that have a diameter of 1 inch or larger shall be grubbed out to a depth of at least 2 feet below subgrade for concrete structures and 1 foot below the ground surface at embankment sites and other designated areas. |
| R6 | All materials cleared and grubbed from the designated areas shall be disposed of at locations shown on the drawings or in a manner specified in section 7. The contractor is responsible for complying with all local rules and regulations and the payment of any and all fees that may result from disposal at locations away from the project site. |
| R7 | Approximately 6 inches of soil, as directed by the Engineer, shall be stripped from the footprint of the excavation and embankments to remove excess organic matter. This work shall include removing the existing rocks larger than 4 inches in size from the embankment footprints. |
| R8 | All structures designated for removal in the contract shall be removed to the specified extent and depth. |
| R9 | Structures or structure parts that are designated to be salvaged shall be carefully removed and neatly placed in the specified or approved storage location. Salvaged structures that are capable of being disassembled shall be dismantled into individual members or sections. Such structures shall be neatly and systematically match marked with paint before disassembly. All connectors and other parts shall be marked to indicate their proper location within the structure and shall be fastened to the appropriate structural member or packed in suitable containers. |
| R10 | Material from fences designated to be salvaged shall be placed outside the work area on the property on which the fence was originally located. Fence wire shall be rolled into uniform rolls of suitable size and neatly piled with other salvaged materials. Posts and rails shall be neatly stacked. |
| R11 | Refuse materials resulting from structure removal shall be disposed of in a manner and at locations specified in section 7 of this specification or in an acceptable manner and at locations approved by the contracting officer. Disposal by burning shall be in accordance with local rules and regulations. |
| R12 | Blasting will not be allowed [for Existing Structure Demolition]. |
| R13 | The structures to be demolished shall be disposed by the Contractor at sites of his own choosing away from the site of the work. The disposal shall be in an environmentally acceptable manner that does not violate applicable laws, rules, and regulations. |
| R14 | Silt fence shall conform to the requirement of Materials Specification 592, Geotextile. All other material furnished shall meet the requirements of the material specifications listed in section 8 of this specification. |
| R15 | The contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to collect and temporarily contain chemical pollutants, such as drained lubricating or transmission fluids, grease, soaps, concrete mixer washwater, or asphalt, produced as a by-product of the construction activities. Pollutants shall be disposed of in accordance with appropriate state and Federal regulations. At the completion of the construction work, tanks, barrels, and sumps shall be removed and the area restored to its original condition as specified in section 8 of this specification. Sump removal shall be conducted without causing pollution. |
| R16 | Sanitary facilities, such as chemical toilets, or septic tanks shall not be located next to live streams, wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water source. At the completion of construction activities, facilities shall be disposed of without causing pollution as specified in section 8 of this specification. |
| R17 | The burning of brush or slash and the disposal of other materials shall adhere to state and local regulations. |
| R18 | Fire prevention measures shall be taken to prevent the start or spreading of wildfires that may result from project activities. Firebreaks or guards shall be constructed and maintained at locations shown on the drawings. |
| R19 | All public access or haul roads used by the contractor during construction of the project shall be sprinkled or otherwise treated to fully suppress dust. All dust control methods shall ensure safe construction operations at all times. If chemical dust suppressants are applied, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer's requirements and recommendations. A copy of the product data sheet and manufacturer's recommended application procedures shall be provided to the engineer 5 working days before the first application. |
| R20 | All pollution control measures and temporary works shall be adequately maintained in a functional condition for the duration of the construction period. All temporary measures shall be removed, and the site restored to near original condition. |
| R21 | The work shall also include developing a Storm Water Pollution Prevention Plan (SWPPP) and procuring a Utah Pollutant Discharge Elimination System (UPDES) Storm Water permit. The SWPPP shall be developed by the Contractor or an experienced consultant in the employ of the Contractor. This bid item shall also include all work required to provide, install, maintain, and remove the items required by the permit. |
| R22 | Concrete trucks, pumpers and equipment clean-up shall be completed in an existing disturbed area away from streams and vegetation. |
| R23 | The Contractor shall provide and maintain, in a neat sanitary condition, such accommodations for the use of his employees as may be necessary to comply with the requirements of the State and Local Boards of Health, or of other bodies or tribunals having jurisdiction therewith. Attention is directed to federal, state, and local laws, rules, and regulations concerning construction safety and health standards. The contractor shall not require any worker to work in surroundings or under conditions which are unsanitary, hazardous or dangerous to his health or safety. The Contractor shall provide toilet facilities for his employees, subcontractors, and the representatives of the Owner and regulatory agencies on the project site. |
| R24 | Equipment for construction surveys shall be of a quality and condition to provide the required accuracy. The equipment shall be maintained in good working order and in proper adjustment at all times. Records of repairs, calibration tests, accuracy checks, and adjustments shall be maintained and be available for inspection by the engineer. Equipment shall be checked, tested, and adjusted as necessary in conformance with manufacturer's recommendations. |
| R25 | All work shall follow recognized professional practice and the standards of the industry unless otherwise specified in section 9 of this specification. The work shall be performed to the accuracy and detail appropriate for the type of job. Notes, sketches, and other data shall be complete, recorded neatly, legible, reproducible and organized to facilitate ease in review and allow reproduction of copies for job documentation. |
| R26 | All computations shall be mathematically correct and shall include information to identify the bid item, date, and who performed, checked, and approved the computations. Computations shall be legible, complete, and clearly document the source of all information used including assumptions and measurements collected. |
| R27 | If a computer program is used to perform the computations, the contractor shall provide the engineer with the software identification, vendor's name, version number, and other pertinent data before beginning survey activities. Computer generated computations shall show all input data including values assigned and assumptions made. |
| R28 | The elevations of permanent and temporary bench marks shall be determined and recorded to the nearest 0.01 foot. Differential leveling and transit traverses shall be of such precision that the error of vertical closure in feet shall not exceed plus or minus 0.1 times the square root of the traverse distance in miles. Linear measurements shall be accurate to within 1 foot in 5,000 feet, unless otherwise specified in section 9 of this specification. The angular error of closure for transit traverses shall not exceed 1 minute times the square root of the number of angles turned. |
| R29 | The minimum requirements for placing slope stakes shall be at 100-foot stations for tangents, as little as 25 feet for sharp curves, breaks in the original ground surface and at any other intermediate stations necessary to ensure accurate location for construction layout and measurement. Slope stakes and cross sections shall be perpendicular to the centerline. Significant breaks in grade shall be determined for cross sections. Distances shall be measured horizontally and recorded to the nearest 0.1 foot. |
| R30 | Unless otherwise specified in section 9 of this specification, measurements for stationing and establishing the location of structures shall be made to the nearest 0.1 foot. Elevations for concrete work, pipes, and mechanical equipment shall be determined and recorded to the nearest 0.01 foot. Elevations for earth work shall be determined and recorded to the nearest 0.1 foot. |
| R31 | These baselines and bench marks shall be used as the origin of all surveys, layouts, and measurements to establish construction lines and grades. The contractor shall take all necessary precautions to prevent the loss or damage of primary control points. Any stakes or control points lost or damaged by construction activity will be reestablished by the contractor or at contractor expense. |
| R32 | Before work starts that requires contractor performed surveys, the contractor shall submit in writing for the engineer's review: the name, qualifications, and experience of the individuals to be assigned to the survey tasks. |
| R33 | The construction staking required for the item shall be completed before work on any item starts. |
| R34 | All survey data shall be recorded in fully identified standard hard-bound engineering survey field notebooks with consecutively numbered pages. All field notes and printed data shall include the purpose or description of the work, the date the work was performed, weather data, sketches, and the personnel who performed and checked the work. Electronically generated survey data and computations shall be bound, page numbered, and cross referenced in a bound field notebook containing the index for all survey activities. All work shall follow recognized professional practice. The construction survey records shall be available at all times during the progress of the work for examination and use by the engineer and when requested, copies shall be made available. The original field notebooks and other records shall be provided to and become the property of the owner before final payment and acceptance of all work. |
| R35 | Complete documentation of computations and supporting data for progress payments shall be submitted to the engineer with each invoice for payment as specified in section 9 of the specification. |
| R36 | The work shall also include participation of Contractor’s key personnel in weekly coordination meetings with the Engineer. |
| R37 | The contractor shall install and maintain access and haul roads and furnish, operate, and maintain all pumps, meters, piping, tanks, storage, and other facilities required to load, transport, store, distribute, and use construction water as specified. These facilities shall be equipped with accurate, work dedicated meters; tanks of known volume; or other devices that provide a correct measurement of water supplied. Meters shall be installed at the point of delivery into water hauling equipment or application system, such as sprinkler systems or flooding systems, as specified. |
| R38 | The contractor shall install, maintain, and operate all cofferdams, channels, flumes, sumps, and all other temporary diversion and protective works needed to divert streamflow and other surface water through or around the construction site. Control of surface water shall be continuous during the period that damage to construction work could occur. Unless otherwise specified and/or approved, the diversion outlet shall be into the same drainageway that the water would have reached before being diverted. |
| R39 | The contractor shall furnish the contracting officer, in writing, a proposed plan for diverting surface water before beginning any construction activities for which a diversion is required, unless waived in section 8 of this specification. |
| R40 | Foundations, cutoff trenches, and all other parts of the construction site shall be dewatered and kept free of standing water and muddy conditions as necessary for the proper execution of the work. The contractor shall furnish, install, operate, and maintain all drains, sumps, pumps, casings, well points, and all other equipment required to properly dewater the site as specified. Dewatering systems that cause a loss of soil fines from the foundation areas will not be permitted. |
| R41 | The contractor shall furnish the contracting officer, in writing, a proposed plan for dewatering before commencing with any construction activity for which dewatering may be required, unless waived in section 8 of this specification. |
| R42 | When temporary works are no longer needed, the contractor shall remove and return the area to a condition similar to that which existed before construction. Areas where temporary works were located shall be graded for sightly appearance with no obstruction to natural surface waterflows or the proper functioning and access to the works of improvement installed. The contractor shall exercise extreme care during the removal stages to minimize the loss of soil sediment and debris that was trapped during construction. Pipes, casings, and any other material used to dewater the site shall be removed from temporary wells. The wells shall be filled to ground level with clean gravel or other suitable material approved by the contracting officer. |
| R43 | It is required that the ground water level be maintained at least 2 feet below the bottom of all excavations and subgrade elevations. Dewatering will likely require wells, trenches, and/or sumps. Routing reservoir inflows or constructing temporary retention of reservoir inflows will likely be required to construct the new outlet conduit. |
| R44 | Dewatering elements shall be designed to provide filtration for surrounding soils and prevent migration of fine soil particles. |
| R45 | The dewatering plan shall provide details regarding the proposed installation and abandonment methods of the individual elements. Installation and abandonment of the elements shall be accomplished without excessive disturbance to surrounding soils. Abandonment of elements shall prevent the possibility that undesirable seepage paths develop after completion of the project. |
| R46 | All installation, operation, and abandonment of dewatering and bypass systems shall be performed in a manner considered acceptable to the Engineer. |
| R47 | Blasting will not be allowed on this project [for Excavation]. |
| R48 | All surplus or unsuitable excavated materials are designated as waste and shall be disposed of at the locations shown on the drawings. |
| R49 | Excavations shall comply with OSHA Construction Industry Standards (29CFR Part 1926) Subpart P, Excavations, Trenching, and Shoring. All excavations shall be completed and maintained in a safe and stable condition throughout the total construction phase. Structure and trench excavations shall be completed to the specified elevations and to the length and width required to safely install, adjust, and remove any forms, bracing, or supports necessary for the installation of the work. |
| R50 | Before correcting an overexcavation condition, the contractor shall review the planned corrective action with the engineer and obtain approval of the corrective measures. |
| R51 | All fill material shall be obtained from required excavations and designated borrow areas. The selection, blending, routing, and disposition of material in the various fills shall be subject to approval by the engineer. Fill materials shall contain no frozen soil, sod, brush, roots, or other perishable material. Rock particles larger than the maximum size specified for each type of fill shall be removed prior to compaction of the fill. |
| R52 | Foundations for earthfill shall be stripped to remove vegetation and other unsuitable material or shall be excavated as specified. Except as otherwise specified, earth foundation surfaces shall be graded to remove surface irregularities and shall be scarified parallel to the axis of the fill or otherwise acceptably scored and loosened to a minimum depth of 2 inches. The moisture content of the loosened material shall be controlled as specified for the earthfill, and the surface material of the foundation shall be compacted and bonded with the first layer of earthfill as specified for subsequent layers of earthfill. |
| R53 | Earthfill shall not be placed until the required excavation and foundation preparation have been completed and the foundation has been inspected and approved by the engineer. Earthfill shall not be placed upon a frozen surface nor shall snow, ice, or frozen material be incorporated in the earthfill matrix. |
| R54 | Earthfill shall be placed in approximately horizontal layers. The thickness of each layer before compaction shall not exceed the maximum thickness specified in section 10 or shown on the drawings. Materials placed by dumping in piles or windrows shall be spread uniformly to not more than the specified thickness before being compacted. |
| R55 | Earth backfill shall be placed in a manner that prevents damage to the structures and allows the structures to assume the loads from the earth backfill gradually and uniformly. The height of the earth backfill adjacent to a structure shall be increased at approximately the same rate on all sides of the structure. |
| R56 | The passage of heavy equipment will not be allowed: Over cast-in-place conduits within 14-days after placement of the concrete; Over cradled or bedded precast conduits within 7 days after placement of the concrete cradle or bedding; Over any type of conduit until the backfill has been placed above the top surface of the structure to a height equal to one-half the clear span width of the structure or pipe or 3 feet, whichever is greater, except as may be specified in section 10. |
| R57 | Compacting of earth backfill adjacent to structures shall not be started until the concrete has attained the strength specified in section 10 for this purpose. The strength is determined by compression testing of test cylinders cast by the contractor's quality control personnel for this purpose and cured at the work site in the manner specified in ASTM C 31 for determining when a structure may be put into service. |
| R58 | Earthfill placed at densities lower than the specified minimum density or at moisture contents outside the specified acceptable range of moisture content or otherwise not conforming to the requirements of the specifications shall be reworked to meet the requirements or removed and replaced by acceptable earthfill. |
| R59 | During the course of the work, the contractor shall perform quality control tests, as applicable, to identify earthfill and earth backfill materials; determine the reference maximum density and optimum moisture content; and document that the moisture content of material at the time of compaction and the density of earthfill and earth backfill in place conform to the requirements of this specification. |
| R60 | Embankments built at different levels as described under (c) or (d) above shall be constructed so that the slope of the bonding surfaces between embankment in place and embankment to be placed is not steeper than 4 feet horizontal to 1 foot vertical. The bonding surface of the embankment in place shall be stripped of all material not meeting the requirements of this specification and shall be scarified, moistened, and recompacted when the new earthfill is placed against it. |
| R61 | When determining the maximum laboratory density of earthfill materials, if the percentage of particles larger than ¾ inch is between 30 and 50 percent, calculate the oversize correction in accordance with ASTM D4718 assuming 30 percent oversize particles in the calculations. If the percentage of particles larger than ¾ inch is greater than 50 percent, complete a test fill under the observation of the Engineer. |
| R62 | Earthfill materials that freeze during or after placement shall be scarified to a depth equal to the frost penetration and reworked or removed and replaced by acceptable earthfill. Removal is required if the frost penetration depth exceeds the specified loose lift thickness for the earthfill material. |
| R63 | If, in the opinion of the engineer, the hauling equipment causes horizontal shears or slick sides, rutting, quaking, heaving, cracking or excessive deformation of the embankment, limit the type, load and/or travel speed of the hauling equipment on the embankment. Any embankment damage caused by hauling equipment must be repaired at the direction of the Engineer. |
| R64 | Rock or concrete surfaces that will be in contact with earthfill materials shall be moist when the earthfill materials are placed against these surfaces. |
| R65 | Compaction shall be Class A Compaction, as specified in Section 6, “Compaction.” All materials shall be moisture conditioned to within 1% below to 2% above the optimum moisture content and shall be compacted to at least 96% of the maximum laboratory density as determined by ASTM D698. A maximum of 2% moisture can be applied after fill is placed on the embankment. Lift thickness shall not exceed 10 inches before compaction for large equipment compacted earthfill, and 6 inches in thickness before compaction for manually operated tamping equipment. |
| R66 | Materials used as roadbase shall conform to the following: Plastic Index ASTM D4318 Non-plastic; Los Angeles Abrasion ASTM C131 40% max; Sodium Sulfate Soundness loss (5 cycles) ASTM C88 12% max; Durability index (coarse and fine aggregate) ASTM D3744 35 min; Fractured faces ASTM D5821 75% min. |
| R67 | The Contractor shall submit a target gradation within the bands shown on the Construction Drawings. The allowable gradation band for roadbase shall be the approved target gradation ± the allowable deviation shown on the Construction Drawings. Unless otherwise approved by the Contracting Officer, only one target gradation shall be approved for the project. |
| R68 | Compaction shall be Class A Compaction, as specified in Section 6, “Compaction.” All materials shall be moisture conditioned to within -3 to +2% of the optimum moisture content and shall be compacted to at least 95% of the maximum laboratory density as determined by ASTM D698. |
| R69 | Drainfill material shall conform to the requirements of Material Specification 521, Aggregates for Drainfill and Filters. A minimum of 30 days before delivery of materials to the site, the contractor shall inform the engineer in writing of the source(s) from which drainfill material will be obtained. The contractor shall provide the engineer free access to the source(s) for the purpose of obtaining samples for testing. |
| R70 | Drainfill shall not be placed until the subgrade has been inspected and approved by the engineer. Drainfill shall not be placed over or around pipe or drain tile until the installation of the pipe or tile has been inspected and approved. |
| R71 | Drainfill shall be placed uniformly in layers not to exceed 12 inches thick before compaction. When compaction is accomplished by manually controlled equipment, the layers shall not exceed 8 inches thick. The material shall be placed to avoid segregation of particle sizes and to ensure the continuity and integrity of all zones. No foreign material shall be allowed to become intermixed with or otherwise contaminate the drainfill. |
| R72 | Traffic shall not be permitted to cross over drains at random. Equipment cross-overs shall be maintained, and the number and location of such crossovers shall be established and approved before the beginning of drainfill placement. Each crossover shall be cleaned of all contaminating material and shall be inspected and approved by the engineer before the placement of additional drainfill material. |
| R73 | The contractor shall conduct such tests as necessary to verify that the drainfill material and the inplace drainfill meets the specification requirements. The engineer shall be granted access to perform such tests as are required to verify that the drainfill materials and the drainfill in place meets the requirements of the specifications. |
| R74 | Portland cement shall conform to the requirements of Material Specification 531, Portland Cement, for the specified type. One brand only of any type of cement shall be used in any single structure as defined in section 25. |
| R75 | The contractor shall furnish the engineer a batch ticket showing amount of concrete in cubic yards, the time of loading, the time the load was discharged, the revolution counter reading at the time of loading and discharge, and the type and actual quantity of each material including all admixtures used in each batch of concrete. |
| R76 | Concrete shall be delivered to the site and discharged completely into the forms within 1.5 hours or before the drum of truck has revolved a total of 300 revolutions, whichever comes first, after the introduction of the mixing water to the cement and aggregates or the introduction of the cement to the aggregates. In hot weather or under conditions contributing to quick stiffening of the concrete, or when the temperature of the concrete is 85 degrees Fahrenheit or above, the time between the introduction of the cement to the aggregates and discharge shall not exceed 45 minutes. |
| R77 | Concrete shall not be placed until the subgrade, forms, steel reinforcement, and other embedments are inspected and approved by the engineer. |
| R78 | Concrete shall be placed only in the presence of the engineer. The contractor shall give reasonable notice to the engineer before each placement. Such notice shall be far enough in advance to give the engineer adequate time to assure that the subgrade, forms, steel reinforcement, and other preparations comply with specifications. |
| R79 | All concrete shall be consolidated with internal type mechanical vibrators capable of transmitting vibration to the concrete at frequencies not less than 8,000 impulses per minute, unless otherwise specified or approved before placement. Vibration shall be supplemented by spading, rodding, and hand tamping as necessary to ensure smooth and dense concrete along the form surface, in corners, and around embedded items. The contractor shall provide a sufficient number of vibrators to properly consolidate the concrete immediately after it is placed. A sufficient number of standby vibrators shall be kept onsite during the placement of concrete. |
| R80 | Freshly placed concrete shall be cured a minimum of 7 days in accordance with the recommended practices set forth in this section. A curing process shall be started as soon as the concrete has hardened sufficiently to prevent surface damage. Curing concrete, including exposed surfaces of formed concrete and concrete in forms, shall be maintained at a satisfactory moisture content for at least 7 days following placement. |
| R81 | Concrete shall be protected against freezing during the first 24 hours after placement whether or not the average weather conditions specified above for cold weather concreting exist. |
| R82 | Whenever the above conditions exist or when climatic conditions are such that the temperature of the concrete may reasonably be expected to exceed 90 degrees Fahrenheit at the time of delivery to the worksite or during the placement operations, the following provisions shall apply: a. The contractor shall maintain the temperature of the concrete below 90 degrees Fahrenheit during mixing, conveying, and placing. |
| R83 | Cement shall be Type V. Concrete mix design shall be in accordance with Method 1, Section 3 Concrete mix design. Concrete shall be Class 4000. Air Content shall be 4.0 to 7.0%. Unless otherwise approved by the Engineer, the concrete slump shall be 4 in. ±1 in. The maximum size coarse aggregate shall not be greater than 1-inch. Construction joints shall be cleaned according to Method 2, Section 13, Construction joints. Unless otherwise approved by the Engineer, all construction joints shall have Sika Swellstop waterstop or approved equal. Waterstop shall be installed in accordance with manufacturer recommendations. |
| R84 | Reinforcement shall not be placed until the prepared site has been inspected and approved. After placement of the reinforcement, concrete shall not be placed until the reinforcement has been inspected and approved by the contracting officer's technical representative (COTR). |
| R85 | Pipe, fittings, and gaskets shall conform to the requirements of Material Specification 547, Plastic Pipe, and as specified in section 14 of this specification or as shown on the drawings. |
| R86 | This item shall consist of furnishing and installing the 30-inch HDPE outlet pipe along with all necessary fittings as shown on the Drawings. The HDPE pipes and fittings shall be PE 4710. All pipe joints shall be made by butt fusion welding. The HDPE pipes shall be sized according to Iron Pipe Size (IPS) dimensions. Unless otherwise approved by the engineer, the pipe shall have a dimension ratio (DR) of 32.5. Pressure testing shall be performed in accordance with Method 3 of Section 12 of this specification. The test pressure at the upstream end of the conduit shall be 30 psi. The pressure test shall be performed prior to encasing the conduit with concrete. |
| R87 | This item shall consist of furnishing and installing the 3-inch HDPE vent along with all necessary fittings as shown on the Drawings. The HDPE pipes and fittings shall be PE 4710. All pipe joints shall be made by butt fusion welding. The HDPE pipes shall be sized according to Iron Pipe Size (IPS) dimensions and shall have a dimension ratio (DR) between 11 and 17. |
| R88 | This item shall consist of furnishing and installing the slotted 6-inch HDPE drain pipe along with all necessary fittings as shown on the Drawings. The HDPE pipes and fittings shall be PE 4710. All pipe joints shall be made by butt fusion welding. The HDPE pipes shall be sized according to Iron Pipe Size (IPS) dimensions and shall have a dimension ratio (DR) of 26. |
| R89 | This item shall consist of providing video camera inspection of all HDPE pipelines installed for the project. The Engineer shall be present to observe all video inspection. In the event that the pipe is damaged or debris, including soil or dirt, is present, the camera inspection shall be repeated following remedial work. The camera inspection shall be repeated should any debris enter the pipe after the video inspection. |
| R90 | Steel pipe shall conform to the requirements of AWWA C 200, Steel Water Pipe, 6 Inches and Larger. Steel pipe fittings shall conform to the requirements of ASTM A858 or A865. |
| R91 | Unless otherwise specified, the steel pipe shall be lined and coated with white polyamide epoxy meeting the requirements of AWWA C210. The lining and coating materials shall be shop applied in at least two coats and shall have a total thickness of at least 16 mils. Application of the coating and lining materials shall be in accordance with AWWA C210. |
| R92 | The steel pipe elbow fitting shall be pressure tested with the 30-inch HDPE pipe. The steel pipe elbow fitting shall be fabricated with the vent opening shown on the Construction Drawings. |
| R93 | Precast Concrete Manhole Sections. All precast sections, including base sections, riser sections, cones, grade rings, and flat slab tops, shall conform to "Standard for Precast Reinforced Concrete Manhole Sections" (ASTM Designation C 478) and to the dimensions shown on the plans. Flat slab manhole top sections shall be designed for an H-20 loading. Cement used in concrete manholes shall be Type V Portland cement. |
| R94 | The manhole covers and frames shall be heavy duty and shall conform to ASTM A-48, Class 30. Bearing surfaces shall be machined to flat, plane surfaces which provide for full contact between frame and cover. The total combined weight of the frame and cover shall not be less than 360 lbs. All frames and covers shall have an access opening of not less than 30 inches and shall be vented with at least 0.5 square feet minimum clear opening. |
| R95 | The manhole shall be cleaned and inspected as defined in “Subsidiary Item – Camera Inspection” of “Construction Specification 45 – Plastic Pipe.” |
| R96 | Articulating Concrete Blocks (ACBs)—ACBs including blocks, cables, and fittings must conform to ASTM D6684, Standard Specification for Materials and Manufacture of Articulating Concrete Block (ACB) Revetment Systems. |
| R97 | When specified in section 7, ACBs must be tested for freeze-thaw durability according to ASTM C666/C666M, Test Method for Resistance of Concrete to Rapid Freezing and Thawing, or ASTM C1262, Test Method for Evaluating the Freeze-Thaw Durability of Dry-Cast Segmental Retaining Wall Units and Related Concrete Units, as applicable. Freeze-thaw durability must be based on tests, conducted not more than 24 months prior to delivery of units made with the same materials, mix proportioning, manufacturing process, and curing method as the blocks installed under this specification. Representative specimens must comply with either of the following: the weight loss of each of five test specimens at the conclusion of 100 cycles must not exceed 1 percent of its initial weight or the weight loss of each of four of the five test specimens at the conclusion of 150 cycles must not exceed 1.5 percent of its initial weight. |
| R98 | ACBs supplied for this project must meet the freeze thaw durability requirements described in Section 2 of this specification. Unless otherwise approved by the Engineer, each open cell block shall have a gross area of at least 1.7 ft2, shall weigh at least 55 lbs, and shall not have more than 20% open area. After installation of the ACB blocks, the open area within and between blocks shall be filled with clean gravel. Unless otherwise recommended by the block manufacturer, the gravel shall have a maximum size of 1 inch and less than 5% passing a No. 30 sieve. The non-woven geotextile shall be a Class I fabric, as defined in Material Specification 592, weighing at least 8 oz/yd2. Adjacent sections of geotextile shall be lapped. |
| R99 | The successful bidder shall furnish to the Engineer within thirty (30) days from the day of award, two sets of installation drawings and instructions and two sets of data showing the manufacturer’s name, model number, and other means of identifying or describing the equipment for the slide gates. Calculations demonstrating that the equipment was designed for the specified seating and/or unseating heads must also be submitted. This information shall be provided to the Engineer at least thirty (30) days prior to gate fabrication and will be used to assist the Engineer in deciding adequacy of the equipment as to the intended purpose, performance, reliability and durability. |
| R100 | The gate shall be a self-contained heavy duty cast iron gate designed for a seating head of at least 65 feet. The gate shall be equipped with a rising type stem. The gate shall be Type MHS-1 as defined in Material Specification 571 – Slide Gates. The stem and all fasteners shall be stainless steel unless otherwise approved by the Engineer. The gate wall thimble shall be cast iron with a square opening on one side to match the gate body and a 30-inch diameter opening on the other side to match the pipe flange. The thimble shall be an E type with a depth of eight (8) inches. The faces of the thimble shall be machined to provide true surfaces for the gate seat and pipe flange. |
| R101 | The gate stem shall be supplied with an oil filled encasement pipe. The stem shall be fully encased within the encasement pipe except near the top and bottom where the encasement pipe would conflict with the operation of the gate. The encasement pipe shall be galvanized or stainless steel. A biodegradable oil, such as vegetable oil, recommended by the manufacturer shall be used to fill the annular space between the gate stem and the stem encasement pipe. The encasement pipe shall be fabricated and assembled to contain the oil without leaking. All metal work used for the gate stem supports shown on the Construction Drawings shall be galvanized steel or stainless steel. |
| R102 | Items specified to be galvanized shall be completely fabricated for field assembly before the application of the zinc coatings. Galvanized items shall not be cut, welded, or drilled after the zinc coating is applied. |
| R103 | The grates shall be hot dipped galvanized after fabrication. |
| R104 | The Contractor shall install instrumentation in the presence of and under the direct supervision of the engineer. |
| R105 | Existing instruments damaged during construction shall be replaced at no additional cost to the Owner. If drilling is required for installation of instruments, air or water pressure shall not be applied while drilling through embankment materials. Unless otherwise approved by the Engineer, drilling through the embankment materials shall be performed using hollow stem auger or sonic methods. |
| R106 | The transmitter and solar panel shall be oriented to maximize reception with the target satellite(s) and sun, as recommended by the manufacturer, for the project location. Procurement of the early warning system shall be coordinated with the Contracting Officer to ensure that the instrument is compatible with the Forest Service monitoring system. |
| R107 | The contractor shall meet with the contracting officer before any work begins and discuss the contractor's quality control system. The contracting officer and the contractor shall develop a mutual understanding regarding the quality control system, including procedures for correcting quality control issues. |
| R108 | The following minimum quality control testing is required: Earthfill - Moisture-Density Relationship: 1 test for each material type; Classification: 1 test for each material type; In-Place Density: 1 test for each lift. 1 test for each 10,000 ft2 portion of a lift if the area of the lift exceeds 10,000 ft2. Drainfill - Maximum Laboratory Density: 1 test for each material type; Classification: 1 test for each 500 yd3 of material placed; In-Place Density: 1 test for each lift. 1 test for each 2,000 ft2 portion of a lift if the area of the lift exceeds 2,000 ft2. Reinforced Concrete - Reinforcement Special Inspection: 1 inspection for each reinforced concrete bid item; Air Content, Slump, Temperature, and Compressive Strength: 1 set of tests for each 100 yd3 placed. |
| R109 | The field office and appurtenances shall be set up, equipped, and made ready for use within 20 days of the receipt of the written Notice to Proceed, unless otherwise specified in section 5. The field office and appurtenances shall remain the property of the contractor and shall be maintained in good condition and appearance until completion of the contract work. |
| R110 | The contractor shall install, provide, and maintain electric and heating utilities unless otherwise specified in section 5. Contractor shall provide a sanitary facility (toilet) in accordance with the minimum OSHA Safety and Health Requirements for use by the Forest Service and their agents (see table 96–1, footnote 1). The contractor shall provide and maintain a reasonable access road to the field office location together with parking for a minimum of four vehicles in the proximity of the field office site. |
| R111 | Before mobilizing and setting up the field office, the contractor shall prepare and submit detailed plans of the office to the engineer. The contractor shall provide access to the engineer for visual verification that the office and equipment meet contract requirements before mobilizing the field office to the work site. |
| R112 | Manufacturer’s Literature: Submit literature for the following items to the Contracting Officer (CO) for approval within 10 day after award of contract. Drawings and literature must be marked to show the exact model, size, and color proposed: 1. Door, louvered vents, and door hardware; 2. Paint, interior and exterior; 3. Caulk, ground and adhesive; 4. Concrete color additive, stains, concrete curing compound and concrete sealer. |
| R113 | Vault restroom shall be a double unit vault. Model “Cascadian” in Java Brown upper exterior wall Board & Bat texture, Java Brown lower exterior wall Horizontal Lap Siding and Evergreen (dark green) Cedar Shake roof with no chase by CXT or approved equal. Vault restroom shall have bird exclusion screens installed on top of vent stacks. Design criteria: Snow Load: 200 lbs/ft2; Wind Load: 90 mph, exposure C from 2015 International Building Code; Seismic Load: Category E from 2015 International Building Code. |
| R114 | Contractor shall coordinate with the manufacturer of the precast concrete building to accommodate installation at the time of delivery. The Contractor shall be responsible to obtain installation instructions from the manufacturer and perform the excavation, backfill, and site grading in accordance with those instructions. The Contractor must have excavation complete prior to delivery of the precast concrete building. The Contractor will be provided 1-week minimum lead-time to have the excavation work performed. |
| R115 | The Contractor must be on site at the time of delivery to perform the backfill operation as soon as the precast concrete building is in place. |
| R116 | Asphalt Binder shall meet the requirements of AC-20 as defined in APWA Standard Specification 32 12 03. Hot mix asphalt shall meet the requirements for Medium Traffic asphalt concrete given in APWA Standard Specification 32 12 05. Aggregate used for the hot mix asphalt shall meet the requirements of DM-1/2. Hot mix asphalt shall be placed in accordance with the requirements given in APWA Standard Specification 32 12 16.13, Plant-Mix Asphalt Paving. Density testing shall be by non-destructive gage testing. |
Recent awards in NAICS 237990
The newest federal contract awards in the same industry code from Department of Agriculture, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-03-01 | OREGON WOODS, INC.Forest Service · 17 - CON - DISASTER, MOSQUITO TRAIL BRUSHING CONTRACT | $185,998 |
| 2026-10-30 | M. PETERS, INC.Forest Service · 127EAW26P0038 - ASH CREEK HELISPOT CONSTRUCTION | $385,174 |
| 2026-10-15 | MIKE MCCONNELLForest Service · 16 - CON - GAOA, ACCESSIBLE UPGRADES - TOILET REPLACEMENT | $983,870 |
| 2026-10-01 | CHIVERS CONSTRUCTION CO INCUnder Secretary for Farm and Foreign Agricultural Services · PA-112 THATCHER RUN REPAIR STORMWATER DAMAGE. CONNEAUTVILLE DAM, REHABILITATION, CRAWFORD COUNTY PA | $178,000 |
| 2026-09-30 | ANSON EXCAVATING & PIPE, INC.Forest Service · SOAP CREEK CAMPGROUND REHABILITATION - STREAMBANK STABILIZATION ALONG 200' OF SOAP CREEK AT THE SOAP CREEK CAMPGROUND. | $66,264 |
| 2026-09-29 | BEAVERS CONSTRUCTION, L.L.C.Under Secretary for Farm and Foreign Agricultural Services · WATERSHED OPS CEDAR CREEK SITE 16 & CEDAR CREEK 16A DAM REPAIR | $1.07 million |
Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.