GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest: requirements and submission rules

63 requirements and 15 submission rules found in the solicitation documents for 1240BH27Q0002. Use them as the start of your compliance matrix.

Solicitation number
1240BH27Q0002
Agency
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA-FS, CSA NORTHWEST 6
NAICS
237990
Set-aside
Small Business Set Aside - Total
Responses due
15 December 2026 (17 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • The Contractor shall submit to the Contracting Officer, for approval, laboratory certification or inspection information.
  • Certification The supporting data submitted to the engineer shall include the name of the manufacturer, the manufac- turer's model number (for standard catalogue items), or the seating and unseating heads for which the gate is designed together with such drawings and specifica- tions as may be necessary to show that the gate con- forms to the requirements of this specification.
  • An access plan shall be submitted in writing prior to beginning construction.
  • A resume detailing the experience of the PLS and the crew chief shall be submitted to the Engineer.
  • The Contractor is required to submit a dewatering plan for review by the Engineer.
  • Revisions or changes in a job mix that are determined to be significant by the engineer shall follow the same submittal and acceptance process as that for the initial job mix.
  • This written batching and mixing plan shall be submitted to the engineer for review and approval not less than 10 working days before the placement of concrete.
  • This report must be submitted no less than 30 calendar days before placing concrete by this method.
  • The repair plan shall be submitted to the engineer for review at least 10 days before any repair or replacement work.
  • Bar schedules, lists and diagrams for the structures shall be submitted to the Engineer at least fifteen (15) days before delivery of the steel to the project site.
  • The identification of the quality control personnel and their duties and authorities shall be submitted to the contracting officer in writing within 15 calendar days after notice of award.
  • The Contractor shall submit to the Contracting Officer, for approval, the names, qualifications, authorities, certifications, and availability of the competent personnel who will perform the quality control activities.
  • Unless otherwise specified in section 10, the original plus one copy of all records, inspections, tests performed, and material testing reports shall be submitted to the engineer within one working day of completion.
  • The original plus one copy of documentation of material delivered shall be submitted to the engineer before the material is used.
  • The location shall be proposed and submitted to the Contracting Officer if not shown on the drawings.

Requirements

IDRequirement
R1Trees and other vegetation designated to remain undisturbed shall be protected from damage throughout the duration of the construction period. Any damages resulting from the contractor's operations or neglect shall be repaired by the contractor.
R2Earthfill, stockpiling of materials, vehicular parking, and excessive foot or vehicular traffic shall not be allowed within the drip line of vegetation designated to remain in place. Vegetation damaged by any of these or similar actions shall be replaced with viable vegetation of the same species, similar condition, and like size unless otherwise approved by the contracting officer.
R3Any cuts, skins, scrapes, or bruises to the bark of the vegetation shall be carefully trimmed and local nursery accepted procedures used to seal damaged bark.
R4Any limbs or branches 0.5 inch or larger in diameter that are broken, severed, or otherwise seriously damaged during construction shall be cut off at the base of the damaged limb or branch flush with the adjacent limb or tree trunk. All roots 1-inch or larger in diameter that are cut, broken, or otherwise severed during construction operations shall have the end smoothly cut perpendicular to the root. Roots exposed during excavation or other operations shall be covered with moist earth or backfilled as soon as possible to prevent the roots from drying out.
R5All trees not marked for preservation and all snags, logs, brush, stumps, shrubs, rubbish, and similar materials shall be cleared from within the limits of the designated areas. Unless otherwise specified, all stumps, roots, and root clusters that have a diameter of 1 inch or larger shall be grubbed out to a depth of at least 2 feet below subgrade for concrete structures and 1 foot below the ground surface at embankment sites and other designated areas.
R6All materials cleared and grubbed from the designated areas shall be disposed of at locations shown on the drawings or in a manner specified in section 7. The contractor is responsible for complying with all local rules and regulations and the payment of any and all fees that may result from disposal at locations away from the project site.
R7Approximately 6 inches of soil, as directed by the Engineer, shall be stripped from the footprint of the excavation and embankments to remove excess organic matter. This work shall include removing the existing rocks larger than 4 inches in size from the embankment footprints.
R8All structures designated for removal in the contract shall be removed to the specified extent and depth.
R9Structures or structure parts that are designated to be salvaged shall be carefully removed and neatly placed in the specified or approved storage location. Salvaged structures that are capable of being disassembled shall be dismantled into individual members or sections. Such structures shall be neatly and systematically match marked with paint before disassembly. All connectors and other parts shall be marked to indicate their proper location within the structure and shall be fastened to the appropriate structural member or packed in suitable containers.
R10Refuse materials resulting from structure removal shall be disposed of in a manner and at locations specified in section 7 of this specification or in an acceptable manner and at locations approved by the contracting officer. Disposal by burning shall be in accordance with local rules and regulations.
R11Blasting will not be allowed.
R12The structures to be demolished shall be disposed by the Contractor at sites of his own choosing away from the site of the work. The disposal shall be in an environmentally acceptable manner that does not violate applicable laws, rules, and regulations.
R13The work shall also include developing a Storm Water Pollution Prevention Plan (SWPPP) and procuring a Utah Pollutant Discharge Elimination System (UPDES) Storm Water permit. The SWPPP shall be developed by the Contractor or an experienced consultant in the employ of the Contractor. This bid item shall also include all work required to provide, install, maintain, and remove the items required by the permit.
R14Concrete trucks, pumpers and equipment clean-up shall be completed in an existing disturbed area away from streams and vegetation.
R15The contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to collect and temporarily contain chemical pollutants, such as drained lubricating or transmission fluids, grease, soaps, concrete mixer washwater, or asphalt, produced as a by-product of the construction activities. Pollutants shall be disposed of in accordance with appropriate state and Federal regulations.
R16Sanitary facilities, such as chemical toilets, or septic tanks shall not be located next to live streams, wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water source.
R17All public access or haul roads used by the contractor during construction of the project shall be sprinkled or otherwise treated to fully suppress dust.
R18If chemical dust suppressants are applied, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer's requirements and recommendations. A copy of the product data sheet and manufacturer's recommended application procedures shall be provided to the engineer 5 working days before the first application.
R19The Contractor shall provide toilet facilities for his employees, subcontractors, and the representatives of the Owner and regulatory agencies on the project site.
R20Before work starts that requires contractor performed surveys, the contractor shall submit in writing for the engineer's review: the name, qualifications, and experience of the individuals to be assigned to the survey tasks.
R21Contractor performed surveys shall consist of all work necessary for: establishing line and grade for all work; setting slope stakes for all work; checking and any supplemental or interim staking; establishing final grade stakes; performing quantity surveys, measurements, and computations for progress payment; other surveys as described in section 9 of this specification
R22The work shall also include participation of Contractor’s key personnel in weekly coordination meetings with the Engineer.
R23The contractor shall install and maintain access and haul roads and furnish, operate, and maintain all pumps, meters, piping, tanks, storage, and other facilities required to load, transport, store, distribute, and use construction water as specified.
R24It is required that the ground water level be maintained at least 2 feet below the bottom of all excavations and subgrade elevations. Dewatering will likely require wells, trenches, and/or sumps.
R25Dewatering elements shall be designed to provide filtration for surrounding soils and prevent migration of fine soil particles.
R26The contractor shall furnish the contracting officer, in writing, a proposed plan for diverting surface water before beginning any construction activities for which a diversion is required, unless waived in section 8 of this specification.
R27Excavations shall comply with OSHA Construction Industry Standards (29CFR Part 1926) Subpart P, Excavations, Trenching, and Shoring. All excavations shall be completed and maintained in a safe and stable condition throughout the total construction phase.
R28Method 1 of Section 4, “Use of Excavated Materials” shall apply. To the extent they are needed, all suitable material from the specified excavations shall be used in the construction of required permanent earthfill or rockfill.
R29Unless otherwise approved, earth and rock materials to be wasted shall be disposed in the Borrow Area shown on the Construction Drawings. Waste areas within the borrow area shall be designated by the Engineer.
R30Compaction shall be Class A Compaction, as specified in Section 6, “Compaction.” All materials shall be moisture conditioned to within 1% below to 2% above the optimum moisture content and shall be compacted to at least 96% of the maximum laboratory density as determined by ASTM D698. A maximum of 2% moisture can be applied after fill is placed on the embankment.
R31Lift thickness shall not exceed 10 inches before compaction for large equipment compacted earthfill, and 6 inches in thickness before compaction for manually operated tamping equipment.
R32Materials used as roadbase shall conform to the following: Plastic Index ASTM D4318 Non-plastic; Los Angeles Abrasion ASTM C131 40% max; Sodium Sulfate Soundness loss (5 cycles) ASTM C88 12% max; Durability index (coarse and fine aggregate) ASTM D3744 35 min; Fractured faces ASTM D5821 75% min.
R33The Contractor shall submit a target gradation within the bands shown on the Construction Drawings. The allowable gradation band for roadbase shall be the approved target gradation ± the allowable deviation shown on the Construction Drawings.
R34For roadbase, all materials shall be moisture conditioned to within -3 to +2% of the optimum moisture content and shall be compacted to at least 95% of the maximum laboratory density as determined by ASTM D698.
R35A minimum of 30 days before delivery of materials to the site, the contractor shall inform the engineer in writing of the source(s) from which drainfill material will be obtained. The contractor shall provide the engineer free access to the source(s) for the purpose of obtaining samples for testing.
R36Filter sand materials shall be compacted to at least 96% of the maximum laboratory density determined by compacting an oven dried specimen in accordance with the procedures described in ASTM D 698, Method A.
R37Unless otherwise approved by the Engineer, gravel drain materials shall be compacted by at least three passes using manually operated equipment weighing at least 500 pounds.
R38For reinforced concrete, Cement shall be Type V; Concrete shall be Class 4000; Air Content shall be 4.0 to 7.0%; Unless otherwise approved by the Engineer, the concrete slump shall be 4 in. ±1 in.; The maximum size coarse aggregate shall not be greater than 1-inch.
R39Unless otherwise approved by the Engineer, all construction joints shall have Sika Swellstop waterstop or approved equal. Waterstop shall be installed in accordance with manufacturer recommendations.
R40Reinforcement shall be epoxy coated grade 60 bars conforming to the requirements of ASTM A775. Concrete cover over reinforcement shall be in accordance with ACI 350 unless otherwise shown on the Construction Drawings.
R41Reinforcement shall be continuous around all corners in all structures.
R42Pressure testing shall be performed in accordance with Method 3 of Section 12 of this specification. The test pressure at the upstream end of the conduit shall be 30 psi. The pressure test shall be performed prior to encasing the conduit with concrete.
R43This item shall consist of providing video camera inspection of all HDPE pipelines installed for the project. The Engineer shall be present to observe all video inspection. In the event that the pipe is damaged or debris, including soil or dirt, is present, the camera inspection shall be repeated following remedial work.
R44The steel pipe elbow fitting shall be pressure tested with the 30-inch HDPE pipe.
R45At least 14 days prior to delivery of materials, provide material submittals to the engineer that verify that all materials to be incorporated into the work conform to this specification [Articulating Concrete Block Revetment System].
R46At least 2 days prior to manufacturing the ACBs, submit a schedule showing anticipated production start and stop times for the manufacture of ACBs that will be incorporated into the work specified herein. Provide the manufacturing location and manufacturing facility contact information. Include the same information for the concrete production facility if different from the ACB manufacturing facility.
R47At least 7 days prior to the start of any installation of the ACB revetment system, submit to the engineer shop drawings for the layout and details including layout sequence and details of joining and anchoring blocks or mats.
R48Prior to delivery, submit ACB concrete compressive strength test results to verify the strength at the time of delivery will meet or exceed the strength required by ASTM D6684.
R49The successful bidder shall furnish to the Engineer within thirty (30) days from the day of award, two sets of installation drawings and instructions and two sets of data showing the manufacturer’s name, model number, and other means of identifying or describing the equipment for the slide gates. Calculations demonstrating that the equipment was designed for the specified seating and/or unseating heads must also be submitted. This information shall be provided to the Engineer at least thirty (30) days prior to gate fabrication
R50The grates shall be hot dipped galvanized after fabrication.
R51Unless otherwise approved by the Contracting Officer, the early warning system shall be procured from the American Millennium Corporation (AMCi) based in Houston Texas.
R52The contractor shall meet with the contracting officer before any work begins and discuss the contractor's quality control system.
R53The field office and appurtenances shall be set up, equipped, and made ready for use within 20 days of the receipt of the written Notice to Proceed, unless otherwise specified in section 5.
R54The Contractor shall submit the layout of the lab trailer to the Engineer for approval at least 10 days before mobilizing the trailer to the site.
R55Submit literature for the following items to the Contracting Officer (CO) for approval within 10 day after award of contract. Drawings and literature must be marked to show the exact model, size, and color proposed: 1. Door, louvered vents, and door hardware. 2. Paint, interior and exterior. 3. Caulk, ground and adhesive. 4. Concrete color additive, stains, concrete curing compound and concrete sealer.
R56Shop Drawings: Submit four sets of shop drawings of the Vault Restroom stamped by a Professional Engineer.
R57Design Calculations: Submit two sets of design calculations showing that the building is designed for the structural loads required, fabrication and transportation loads, and crack prevention and control.
R58Concrete Delivery Certificates: Supplier shall furnish a certificate with each truckload of concrete delivered showing the items in the following list. Submit these certificates to the CO upon delivery of the Vault Restroom.
R59Vault restroom shall be a double unit vault. Model “Cascadian” in Java Brown upper exterior wall Board & Bat texture, Java Brown lower exterior wall Horizontal Lap Siding and Evergreen (dark green) Cedar Shake roof with no chase by CXT or approved equal.
R60Provide a 12”x 12”x 1” color sample to the Contracting Officer for approval. The following components shall contain colored concrete: 1. Building roof panels 2. Building wall panels
R61Notify the Contracting Officer at least 24 hours before any concrete placement to permit inspection [Precast Concrete Vault Restroom].
R62The Contractor must have excavation complete prior to delivery of the precast concrete building. The Contractor will be provided 1-week minimum lead-time to have the excavation work performed.
R63The Contractor must be on site at the time of delivery to perform the backfill operation as soon as the precast concrete building is in place.

Recent awards in NAICS 237990

The newest federal contract awards in the same industry code from Department of Agriculture, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2027-03-01OREGON WOODS, INC.Forest Service · 17 - CON - DISASTER, MOSQUITO TRAIL BRUSHING CONTRACT$185,998
2026-10-30M. PETERS, INC.Forest Service · 127EAW26P0038 - ASH CREEK HELISPOT CONSTRUCTION$385,174
2026-10-15MIKE MCCONNELLForest Service · 16 - CON - GAOA, ACCESSIBLE UPGRADES - TOILET REPLACEMENT$983,870
2026-10-01CHIVERS CONSTRUCTION CO INCUnder Secretary for Farm and Foreign Agricultural Services · PA-112 THATCHER RUN REPAIR STORMWATER DAMAGE. CONNEAUTVILLE DAM, REHABILITATION, CRAWFORD COUNTY PA$178,000
2026-09-30ANSON EXCAVATING & PIPE, INC.Forest Service · SOAP CREEK CAMPGROUND REHABILITATION - STREAMBANK STABILIZATION ALONG 200' OF SOAP CREEK AT THE SOAP CREEK CAMPGROUND.$66,264
2026-09-29BEAVERS CONSTRUCTION, L.L.C.Under Secretary for Farm and Foreign Agricultural Services · WATERSHED OPS CEDAR CREEK SITE 16 & CEDAR CREEK 16A DAM REPAIR$1.07 million

Source: USAspending.gov, retrieved 2026-11-06. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.