30 requirements and 1 submission rules found in the solicitation documents for 12363N27Q4006. Use them as the start of your compliance matrix.

Solicitation number
12363N27Q4006
Agency
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA-FS, STEWARDSHIP CONTRACTING BRANCH
NAICS
115310
Set-aside
Small Business Set Aside - Total
Responses due
30 November 2026 (2 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Submit Pesticide Use Proposal (PUP) and Weed Occurrence Form to forest botanist or pesticide use coordinator to review for compliance with the Lincoln National Forest NNIP EIS. d.

Requirements

IDRequirement
R1Solicitation is Restricted to the Land Management Integrated Resources (LMIR) BPA. This will only be sent out to the current BPA Award Holders as of Issue Date.
R2ALL QUOTES SHALL BE EMAILED TO: CHAD.BULLOCK@USDA.GOV; JAMES.KAMINSKI@USDA.GOV: D__QUOT.6pp68a0qwni6pj9d@u.box.com on or BEFORE November 30, 2026, 10:00 AM MOUNTIAN TIME.
R3Follow this naming convention for your attachments and keep the subject line the same or just reply all to this email. 27Q4006-LMIRBPA-VendorName-Quote AND 27Q4006-LMIRBPA-VendorName-Technical.
R4OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
R5Be sure to fill out all required documentation. Required to be filled in below: Company Name, POC Name, Phone number, Email, BPA/IDIQ/MATOC Contract #, UEI SAM #
R6Contractor: Confirm business size by NAICS code below: Small___ Large___ Initial:______
R7This is a single award call order. Contractor must provide pricing for all items listed under Box 20.
R8Specific item due dates or deliverable due dates are mandatory, not arbitrary, and must be met accordingly, regardless of the final period of performance date.
R9Early detection surveys will follow National Forest Service guidance and include documentation and mapping.
R10Hand pulling (manual) removal of weeds is permitted. i. Pulled to root depth, placed in sealed plastic bags, and properly disposed.
R11Mechanical removal of weeds is not permitted.
R12Herbicide treatment is allowed for new small, localized weed occurrences. i. Individual polygons will be created by species 1. Not more than one herbicide to be used per polygon 2. Prior to treatment, GIS data (shapefile, geodatabase) and pesticide use proposal (Appendix E) will be submitted and reviewed by the Forest Botanist or pesticide use coordinator.
R13Herbicides shall only be used in accordance with the Lincoln National Forest Integrated Non-Native Invasive Plant Management Project EIS.
R14Contractor is responsible for providing all necessary equipment and herbicide.
R15Timing: surveys and treatment for warm season species that establish with monsoon rains should be surveyed once in the spring (March-May) and once prior to or during early monsoons (June-July).
R16Frequency: A minimum of two surveys in each identified area will be performed in these time periods, with potential for a third visit if necessary to complete treatment or to detect/treat response to a late season precipitation event.
R17Completion: All Early Detection and Rapid Response surveys, inventories, treatments, and respective data reporting, must be completed by October 28, 2027.
R18Reporting requirements for invasive species survey, inventory, and treatment activities will follow National Forest Service standards, and include: a) Record survey areas for both negative and positive inspection results b) Map perimeters of infestations c) Establish photo points (Record GPS location, photos in the four cardinal directions) d) Complete Weed Occurrence Form to document inventory of infestation for each positive detection (Appendix C, minimum required fields in bold) e) Complete Weed Monitoring and Treatment Form to document each treatment application (Appendix D) f) Complete Pesticide Use Proposal (PUP) to document each treatment application (Appendix E, instructions in Appendix F)
R19Record survey areas by GIS polygon using any GPS device that can export as (GPX, shapefile, or geodatabase) i. Line and point data (layers) are not supported.
R20To ensure consistency in survey documentation, treatment decisions, and reporting, invasive plant occurrences shall be classified according to the following infestation size categories: Small, Localized Occurrence, Moderate Infestation, and Large Infestation.
R21New Mexico pesticide applicator license and/or operator license required for all personnel handling herbicides.
R22The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
R23The Contractor shall conduct inspections of i.e., treatment units and record the results using procedures described herein (use the treatment effectiveness section of the Weed Monitoring and Treatment Form in Appendix D). Inspections shall be maintained concurrent with contract work. Completed inspection forms shall be made available to the Government within 24 hours of completion of each i.e., treatment unit and will remain part of the permanent contract file.
R24The Contractor shall submit legible inspection forms. Illegible and incomplete forms shall be returned to the Contractor for correction and re-submission.
R25Contractor must provide: GIS polygons for all surveyed areas—no lines or points allowed; Documentation and mapping of weed infestations, including species and population details; Records of negative detections (areas where no weeds were found); Photo points for each positive infestation (GPS location + 4 cardinal direction photos); Completed Weed Occurrence Forms for each positive detection.
R26The Contractor shall notify the COR when units are completed prior to his moving out of the general area.
R27The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 10/28/2027.
R28A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at Smokey Bear Ranger District , 901 Mechem Dr, Ruidoso, NM 88345.
R29Contractor must send a technical capability statement briefly explaining: How they intend to complete this contract as far as time frame, personnel, and deliverables as well as explaining experience in survey work. Include relevant past performance information. How they intend to complete this contract as far as time frame, personnel, and deliverables as well as explaining experience post fire Burned Area Emergency Response or Early Detection Rapid Response for Non-native invasive species identification and treatment. Please include: 1. Equipment and contractor capability 2. Timing of when contractor can begin and/or finish the project 3. Past performance, references, and USFS feedback 4. Technical proposal /proposed approach to project
R30Quotes will be reviewed initially under a Pass/Fail evaluation to determine if the Technical Capability meets requirements of the call order. Quotes must be signed. Those that do not meet the requirements will be marked unresponsive.

Recent awards in NAICS 115310

The newest federal contract awards in the same industry code from Department of Agriculture, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2027-12-01JOEL FYOCKForest Service · TIMBER SALE PREP - (FLAT BRANCH) DESOTO RD$110,250
2027-10-01JOEL FYOCKForest Service · TIMBER SALE PREP - WOODFORD PROJECT AREA$162,150
2027-08-02G E FORESTRY, INCForest Service · GREYS RIVER ROADSIDE TREATMENTS THINNING AND PILING TASK ORDER, BRIDGER TETON NATIONAL FOREST$153,479
2027-07-16AQUATIC CONTRACTING LLCForest Service · BEAVER CAMPGROUND SIDE CHANNEL RESTORATION. STREAM RESTORATION TO RE-CONNECT SIDE CHANNEL$23,510
2027-07-16AQUATIC CONTRACTING LLCForest Service · SKAMANIA COUNTY WOOD PLACEMENT PROJECT PURPOSE IS TO SALVAGE RECENTLY FELLED TREES ON FS LAND FOR USE IN AQUATIC HABITAT RESTORATION PROJECTS$24,810
2027-07-01SPROUT FORESTRY INCORPORATEDForest Service · SHADOW MOUNTAIN DITCH CREEK HAND THIN, PRUNE, PILE, AND SLASH TREATMENTS, JACKSON RANGER DISTRICT, BRIDGER-TETON NATIONAL FOREST$182,196

Source: USAspending.gov, retrieved 2026-10-30. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.