Submission rules that can disqualify a bid
- ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.
Requirements
| ID | Requirement |
|---|---|
| R1 | Proposals are to be submitted via email to Bonnie Yoakum at bonnie.yoakum@usda.gov and Matt Daigle at matthew.daigle@usda.gov. |
| R2 | solicitation response due date and time to 9:00 AM MST on 12/11/2026 |
| R3 | deadline of 11/13/2026 for additional questions. |
| R4 | Offerors are responsible for ensuring that any submitted subcontracting plan complies with the solicitation requirements, FAR Part 19, and FAR 52.219-9. |
| R5 | A contractor may apply FAR 52.222-43 by submitting a request to the Contracting Officer within 30 days of receiving a new wage determination, including supporting documentation that demonstrates the actual increase or decrease in wages, fringe benefits, and associated payroll costs required by the updated wage determination or applicable minimum wage change. |
| R6 | Should lop and scatter costs be assumed in the pricing? A.7. Yes |
| R7 | Surveys are to follow FP-24 specifications, the description of work located in attachment C04l_Road Survey Description of Work provides a synopsis of requirements . |
| R8 | the deliverable WSQE with worklists must be in Microsoft excel format for the preliminary submittals and in a pdf format for final worklist and plans with the final Microsoft Excel WSQE and worklist submitted as backup. |
| R9 | Certifications are due at time of proposal submission. Refer to solicitation instructions in 52.212-1 and it's addenda. |
| R10 | Thin from below across the stand leaving gaps, openings, and clumps to create mosaic patterns and maintain desirable species. Retain an average of 60-80 sq ft. of basal area (or roughly 60-110 TPA based on an assumed 12 in DBH average) across the harvest unit. |
| R11 | Species preference is PP=WL>WP>DF>ES>GF>LP>SAF. |
| R12 | In root rot pockets and brushy openings, daylight the PP/WL and remove the diseased/dead trees. Where root disease is obvious, remove all trees within the root disease pocket to reduce advancing spread. |
| R13 | Pacific yew is to be retained in all units whenever feasible. Maintain a minimum of 50% of live yew in any given stand in patches of 1/4 – 1/2 acer in size. |
| R14 | Retain between 80 to 120 sq ft. of basal area (roughly 100-150 TPA based on an assumed 12 in DBH average) by Thinning from Below across the stand leaving gaps, openings, and clumps to create mosaic patterns and maintain desirable species. |
| R15 | Leave all trees greater than 21” DBH with a minimum average of ≥15 TPA over 21” DBH. |
| R16 | Retain all snags ≥21” DBH and at least 40’ tall with a minimum of .5 snags per acre. |
| R17 | Thin throughout the diameter range of minimum cutting spec up to 20.9” DBH retaining 100 -140 sq. ft. basal area (approximately 85-115 TPA based on a 15” DBH average) leaving the largest and healthiest trees available |
| R18 | Remove all GF, SAF, and LP. |
| R19 | Brush and shrub greater than 1 foot in height will be treated. |
| R20 | Stump height is not to exceed 6” with a target of 0-6” with no lower live limbs left |
| R21 | For PCT activities, fuel depth should be reduced to a depth of 2 ft or less and bucked to 4’ lengths or less. |
| R22 | For mastication, Piles of this debris greater than 3 inches deep over a 25 square foot area are unacceptable. |
| R23 | The result of the treatment will be small debris (limbs, sticks, needles, “chips”) less than or equal to 3 inches in diameter by 1 foot to 4 feet in length over entire treatment area. |
| R24 | No trees will be fell across or into creeks/water features or roadways. |
| R25 | Contractors shall remove any debris, slash material or chip residue, that is cast or falls onto roadways or water features (including banks, cut banks and road shoulders) prior to the changing locations within the project area. |
| R26 | All marking recommendations will be reviewed and approved by the agency Silviculturist prior to implementation. |
Recent awards in NAICS 113310
The newest federal contract awards in the same industry code from Department of Agriculture, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-06-15 | NOBLE EXCAVATING INCForest Service · MITCHELL JACKSON IRSC-12363N26C4005 TOTAL FOREST PRODUCT VALUE APPLIED: $1,124,270.25 TOTAL APPROPRIATED FUNDS APPLIED: $6,488,660.97 TOTAL CONTRACT VALUE: $7,612,931.32 COR: LAUREN SAINT PIERRE (TIMB | $6.49 million |
| 2026-10-07 | PEACHTREE LUMBER COMPANY, INCForest Service · BUCK HELENE FUELS REDUCTION IRSC -12363N26C4003 $32,400.00 TIMBER VALUE APPLIED $87,804,491.92 TOTAL DOLLAR VALUE APPLIED $87,836,891.92 TOTAL CONTRACT VALUE COR: BRYAN KILLIAN PERFORMANCE PERIOD FOR | $99.58 million |
| 2026-10-05 | J J EXCAVATION INCForest Service · ALAMITOS STEWARDSHIP SC CONTRACT NO. 12363N26C4008 CARSON NF, CAMINO REAL RD PERIOD OF PERFORMANCE: DATE OF AWARD - 11/15/2028 COR: LANDEN ARCHULETA - LANDEN.ARCHULETA@USDA.GOV THE ALAMITOS STEWARDSHI | $3.29 million |
| 2026-09-30 | RAPID RESPONSE DISASTER SERVICES LLCForest Service · THE OBJECTIVE OF THIS PROJECT IS TO REDUCE FUEL LOADING RESULTING FROM HURRICANE HELENE ALONG ROADS THAT ARE USED AS CONTAINMENT LINES FOR WILDFIRES AND PRESCRIBED BURNS ON THE GRANDFATHER RANGER DIST | $1.17 million |
| 2026-09-25 | J J EXCAVATION INCForest Service · LUMBRE STEWARDSHIP SC CONTRACT NO. 12363N26C4007 CARSON NF, CAMINO REAL RD PERIOD OF PERFORMANCE: DATE OF AWARD - 11/15/2028 COR: LANDEN ARCHULETA - LANDEN.ARCHULETA@USDA.GOV | $3.02 million |
| 2026-09-24 | MONTANA FOREST CONSULTANTS, LLCForest Service · LINCOLN SPRINGS STEWARDSHIP IRSC 12363N26C4009/12363N26Q4090 HELENA-LEWIS AND CLARK NF, LINCOLN RANGER DISTRICT VALUE OF PRODUCT=$303,127.87 (75% OUT OF $404,170.49) VALUE OF SERVICE=$874,767.60 TOTAL | $571,640 |
Source: USAspending.gov, retrieved 2026-11-10. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.