Repair Building Systems (Peoria, IL): requirements and submission rules

17 requirements and 10 submission rules found in the solicitation documents for 1232SA27Q0003. Use them as the start of your compliance matrix.

Solicitation number
1232SA27Q0003
Agency
AGRICULTURE, DEPARTMENT OF / AGRICULTURAL RESEARCH SERVICE / USDA ARS AFM APD
NAICS
236220
Set-aside
Small Business Set Aside - Total
Responses due
02 December 2026 (4 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Questions that are not submitted in writing or that are not submitted by this deadline above may not receive a response.
  • (b) quote submission must include: (1) Email quote as described above including pricing, signatures, SAM Unique Entity Identifier (UEI) # on the SF-1442 form.
  • ACKNOWLEDGEMENT OF AMENDMENTS OFFER (Must be fully completed by offeror) (The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) AMENDMENT NO.
  • Questions All questions pertaining to this solicitation, including questions that arise during the site visit, must be submitted to spencer.hamilton@usda.gov by 12:00 p.m.
  • Questions/answers discussed at the site visit will not be binding on the resultant contract unless submitted in writing and incorporated into the solicitation by amendment.
  • Quote Submission Instructions (a) To be considered for award, quotes must be submitted by email to Spencer Hamilton at spencer.hamilton@usda.gov.
  • (4) Active registration at SAM.gov (required at quote submission or your quote will not be accepted).
  • If reps and certs are not filled out in SAM.gov, these shall be filled out and accompanied with your quote.
  • If an example of past performance submitted is determined to be non- relevant, it will not be further evaluated for quality of performance. e.
  • Contractor must be registered in System for Award Management (SAM) prior to submitting a bid.

Requirements

IDRequirement
R1Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .
R2The Government intends to make one award from this solicitation. Therefore, to be considered responsive, contractors must submit pricing for all items.
R3If a proposal is above $150K, a bid guarantee is required in an amount not less than 20 percent of the proposed price but shall not exceed $3,000,000 (for proposals of $35,000 or more). Failure to furnish the required bid guarantee in the proper form and amount, by the time set for receipt of proposals, shall require rejection of the proposal in all cases except those listed in Federal Acquisition Regulation (FAR) 28.101-4.
R4Bid Bonds must be provided using Standard Form 24 (see FAR 28.106-1) electronic versions of Bid Guarantee will be accepted. Individual sureties have to be acceptable to the Contracting Officer (see FAR 28.203) and be accompanied by Standard Form 28 Affidavit of Individual Surety.
R5Contractors are reminded that any amount awarded over $35,000.00 shall require a Payment Bond (SF 25A), and awards exceeding $150,000.00 shall require both Payment and Performance Bonds (SF 25). Payment and Performance bonds are due no later than 10 days after notification of award.
R6Due to the complexity of the project site, site visit is mandatory so that vendors can inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions which may affect the cost of performance of the contract, to the extent such information is reasonably available.
R7Visitors bring photo identification. Non-US citizens should bring a passport. Visitors must sign-in and out.
R8All individuals interested in attending the site visit must RSVP by emailing spencer.hamilton@usda.gov and chris.johnson3@usda.gov@usda.gov, no later than 12:00 p.m. Central Time on Monday November 1, 2026 with a list of names of attendees.
R9Acknowledgement of any solicitation amendment(s) on SF-30.
R10Technical Experience: Quote shall adequately describe your company’s technical experience in performing similar projects. Quote shall include a detailed descriptive listing of a minimum of three (3) projects performed within the past five (5) years that are similar in nature to the one described in this solicitation. “Similar” is defined as projects comparable in terms of such factors as construction, demolition, and renovation as described in the scope of work, including duration and dollar value for types of services performed or level of Contractor responsibility and authority. The quote shall adequately describe how the project will be completed within the period of performance.
R11Past Performance: Provide relevant examples of Past Performance for three (3) previous projects that the offeror has performed within the previous 5 years. The projects should be similar to the requirements of this project in terms of scope, dollar value, and level of complexity and nature of effort. The examples must include: (a) a detailed explanation of the complexity and nature of effort; (b) the dollar value; (c) period of performance;(d) project location; and (e) valid email address; point of contact and telephone number.
R12Price: Pricing for Base Item and Option Items.
R13The Offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.
R14The contractor shall provide a detailed technical proposal and cost estimate for the entire project as specified in this statement of work. 1) Provide upgrades to the steam condensate system.
R15The contractor shall provide the bid options in their technical proposal and cost estimate to include the following tasks. 1) Bid Option #1: Electrical Vault 1 upgrades 2) Bid Option #2: Electrical Vault 6 upgrades
R16The contractor will submit a Site-Specific Safety Plan (SSSP) in industry recognizable format to the CO and COR within 14 days of the contract award.
R17The Contractor shall provide a CPM project schedule within seven (14) calendar days after the date of receipt of award. The schedule shall show all work activities are successfully completed within the period of performance.

Recent awards in NAICS 236220

The newest federal contract awards in the same industry code from Department of Agriculture, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2027-03-01RODRIGUEZ & GARLAND INCForest Service · ANGELITO TRAIL RECREATIONAL SITE ERFO REPAIRS$2.72 million
2027-01-01LIBERTY ELECTRIC INCForest Service · GAOA LCIC LIGHTING UPGRADE (RE-SOLICITATION)$664,550
2027-01-01XENTURIS LLCForest Service · GAOA LCIC LIGHTING UPGRADES$0
2026-10-22AMER-X INC/ROOFING/BLADESForest Service · PROJECT NAME: METHOW VALLEY RD WAREHOUSE ROOF REPLACEMENT$108,350
2026-10-16AMER-X INC/ROOFING/BLADESForest Service · THE PROJECT INCLUDES ALL LABOR, MATERIALS, EQUIPMENT, SUPPLIES, SUPERVISION, AND INCIDENTALS NECESSARY FOR TWO CEDAR SHINGLE ROOF REPLACEMENTS IN THE GOLD BEACH RANGER STATION LOCATED IN THE GOLD BEAC$169,000
2026-10-16KCAPEX LLCForest Service · REPAIR HAIL DAMAGE$531,753

Source: USAspending.gov, retrieved 2026-10-28. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.