Submission rules that can disqualify a bid
- RSVP Deadline: Offerors planning to attend must email the POC no later than Friday, October 23, 2026, at 12:00 PM CST with the company name and full legal names of attendees.
- All questions concerning this solicitation must be submitted in writing via email to the Government Point of Contact:
- All quotes received by the closing deadline will be ranked in order of Total Evaluated Price (TEP), from lowest to highest.
- 4.1 Accounting For Contract Services – If required by FAR Subpart 4.17, the Contractor shall report contract performance data annually directly into SAM.gov (www.sam.gov).
- To be rated "Technically Acceptable," an offeror’s Volume I submission must be rated Acceptable under all four (4) of the following sub-factors.
Requirements
| ID | Requirement |
|---|---|
| R1 | The contractor is responsible for all ancillary installation materials (Cat6/fiber cabling, patch panels, connectors, mounting brackets, and PoE network switches) and network/software configuration. |
| R2 | Conduct semi-annual maintenance inspections in strict accordance with the 12-point Security Camera Maintenance Checklist across all contract periods. |
| R3 | Provide routine response (within 4 business hours; on-site within 24–48 hours) and 24/7/365 critical emergency response (within 1 hour; on-site within 4 hours for outages affecting >25% of cameras or the primary NVR). |
| R4 | Maintain system readiness utilizing a Government-established Not-to-Exceed (NTE) allowance of $3,000.00 per contract year (individual items over $250.00 require Contracting Officer/COR pre-approval and are invoiced at direct actual cost with zero markup). |
| R5 | In accordance with FAR 52.204-24, FAR 52.204-25, and FAR 52.204-26 (and applicable FAR Part 40 Supply Chain Security directives), offerors shall not quote, provide, or use any covered video surveillance equipment or services produced by Dahua Technology Company, Hangzhou Hikvision Digital Technology Company, or any of their subsidiaries or affiliates. All quoted ancillary hardware, network switches, and replacement components must fully comply with federal supply chain security regulations and be NDAA/TAA compliant. |
| R6 | All attendees must process through the Daleville Gate Visitor Control Center (VCC), open 8:00 AM – 4:00 PM CST, Monday through Sunday, to obtain an installation pass. |
| R7 | Attendees must present valid Government-issued REAL ID or federal photo identification. |
| R8 | Sub-factor A (Integration Approach): Technical narrative describing how the offeror will integrate feeds from Buildings 8354, 8355, and 8356 into Building 8350, network configuration, ancillary materials provision, and GFE NVR assessment within 10 days of award. |
| R9 | Sub-factor B (Maintenance Plan): Methodology for conducting semi-annual maintenance in compliance with the 12-section PWS checklist and delivering reports within 48 hours. |
| R10 | Sub-factor C (Response Times): Clear demonstration and operational plan to fulfill 4-hour routine and 24/7/365 1-hour critical response / 4-hour on-site arrival requirements. |
| R11 | Sub-factor D (Compliance): Confirmation of 1-year parts/labor warranty, adherence to DPW inspections, $3,000 NTE parts procedure, AT/OPSEC Level I training, and security badging requirements. |
| R12 | Completed Attachment 3 – Volume Pricing Schedule in its original Microsoft Excel (.xlsx) format. |
| R13 | The Contractor shall furnish all personnel, management, tools, equipment, materials, and transportation necessary to integrate, configure, and maintain the existing Government-Furnished Equipment (GFE) closed-circuit television (CCTV) / surveillance cameras located across the designated barracks facilities into a central system location. |
| R14 | The Contractor is responsible for providing all necessary ancillary integration materials—including, but not limited to, network cabling (Cat6/fiber), connectors, mounting brackets, network patch panels, and compatible network switches—to achieve a fully functional, integrated, central security surveillance system. |
| R15 | The requirement must support real-time video monitoring in the centralized monitoring point throughout the entire 164th TAOG Brigade (Single Soldier barracks) located at Fort Rucker, Alabama. |
| R16 | The contractor will be responsible for network configuration, port forwarding, and any software/hardware installation required to stream video from buildings 8354, 8355, and 8356 to the central monitoring station in building 8350. |
| R17 | The contractor shall provide maintenance of the CCTV system installed into Soldiers Barracks according to the included Security Camera Maintenance Checklist. Contractor will adjust viewing angles of cameras and adjustments to system at the time of the inspections. |
| R18 | The contractor will provide written notification of completion of the semi-annual maintenance within 48hrs of completion. |
| R19 | Contractor will provide a 1-year manufacturer's warranty for when new parts are installed and a 1-year contractor warranty on all labor and workmanship warranty for all newly installed equipment. |
| R20 | The Contractor shall not procure any individual replacement component exceeding $250.00 without prior written approval from the Contracting Officer (KO) or Contracting Officer’s Representative (COR). All parts shall be invoiced at direct actual cost, supported by contractor invoices or receipts, without additional contractor fee, overhead, or markup, up to the funded NTE ceiling. |
| R21 | Routine Maintenance / Non-Critical Calls: The Contractor shall respond via telephone or email within four (4) business hours of notification and arrive on-site within twenty-four (24) to forty-eight (48) hours, Monday through Friday, 0800–1630 local time |
| R22 | Critical System Failures (Outages affecting >25% of coverage or the primary NVR): The Contractor shall respond via telephone within one (1) hour and deploy qualified personnel on-site within four (4) hours of initial notification, 24/7/365. |
| R23 | Contractor will ensure all equipment maintains in accordance with FT Rucker building codes and Department of Production Works (DPW) specifications. All work is to be inspected by DPW before finalization of the completed project. The equipment must be operational prior to Government acceptance. |
| R24 | Contractor must review the current equipment list to determine if the current system is suitable or integration. |
| R25 | The Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy. |
| R26 | The Contractor shall be responsible for furnishing each employee, and for requiring each employee to display or possess appropriate identification. The Contractor shall provide each employee an identification (ID) badge on contract start date or on employment start date. The ID badge shall be made of nonmetallic material to prevent electrical shock. The ID badge shall be easily readable and include the employee's name, contractor's name, functional area of assignment, security clearance if applicable, and color photograph. |
| R27 | Contractor personnel shall wear the ID badge at all times unless it presents a safety hazard. ID badges will be worn when performing work under this contract to include attending Government meetings and conferences. Unless otherwise specified in the contract, each Contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit such placement. |
| R28 | Contractor vehicles shall have signage indicating the company’s name, address, and telephone number. |
| R29 | The Contractor shall integrate all operational barracks cameras into a centralized Network Video Recorder (NVR) / Video Management System (VMS) architecture. The Contractor shall utilize the designated current GFE NVR as the master recording and management unit. |
| R30 | If existing GFE NVRs lack sufficient channel capacity or network throughput to support all required feeds concurrently, the Contractor shall notify the Contracting Officer’s Representative (COR) in writing within ten (10) calendar days of award with a recommended sizing solution. |
Recent awards in NAICS 561621
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-09-30 | KCORP RELIANCE COMPANY, INC.Department of the Army · CCTV SYSTEM (ICIDS) | $97,190 |
| 2026-09-29 | LOCURRENT SYSTEMS, LLCDepartment of the Army · ANC CCTV OY 3 | $241,758 |
| 2026-09-28 | ADVANTOR SYSTEMS II LLCDepartment of the Army · ADVANTOR BASE-WIDE UPGRADE FOR THE FOLLOWING INTERCONNECTIONS: VMS, CAMERA TECHNOLOGY REFRESH AND BUILDING 500 ASN RELOCATION AND PIR ADDITION. | $261,188 |
| 2026-09-25 | DORMAKABA ITALIA S.R.L.Department of the Army · TESTING, INSPECTION, SOFTWARE TUNING AND SPARE PARTS ON KABA ACCESS SYSTEM AT DEL DIN, VICENZA, ITALY AND TESTING, INSPECTION AND SPARE PARTS ON KABA ACCESS SYSTEM AT CAMP DARBY, LIVORNO, ITALY | $51,788 |
| 2026-09-21 | LDIA HOLDINGS, LLCDepartment of the Air Force · BASE IDENTIFICATION SECURITY SYSTEMS MAINTENANCE AND SUPPORT SERVICES | $137,660 |
| 2026-09-16 | SECURITY2000 LLCDepartment of the Army · INTRUSION DETECTION SYSTEM MAINTENANCE. | $72,817 |
Source: USAspending.gov, retrieved 2026-10-18. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.