TenderAxiom

TenderAxiom · Opportunities

MITR Chemically Milled Plate: requirements and submission rules

37 requirements and 6 submission rules found in the solicitation documents for 0000964171. Use them as the start of your compliance matrix.

Solicitation number
0000964171
Agency
ENERGY, DEPARTMENT OF / ENERGY, DEPARTMENT OF / PNNL CONTRACTS - DOE CONTRACTOR
NAICS
332999
Set-aside
No Set aside used
Responses due
05 December 2026 (7 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Request for Proposal Number: 964171 3 Proposals are due by the Proposal Due Date provided below.
  • Request for Proposal Number: 964171 6 Unless otherwise specified, Contractor shall provide all documents required by this contract to the Battelle Contracts Representative on or before the required due date for each contract deliverable.
  • DOE 790 6th Street Richland, WA 99354 US Anticipated Freight Terms: FOB Destination Prepaid and Allowed Proposal Due Date: 09/24/2026 Required Delivery Date: June 30, 2027 Contract Type: Fixed Price Proposal Offeror proposes to sell the goods (or alternates as specified) at the prices indicated in accordance with the General Provisions, Specification, and other provisions/documents of the Request for Proposal.
  • Submit proposals via email to christopher.martin@pnnl.gov with a subject line that includes the words "Proposal to RFP 964171".
  • If the Contractor revises its QA program/system during the term of this contract, the Contractor shall submit the latest revision to the Battelle Contracts Specialist for review and acceptance.
  • The completed CNCR shall be submitted by the Contractor to the Battelle Contracts Representative to request Battelle to accept a deliverable not meeting all of Battelle's technical requirements.

Requirements

IDRequirement
R1The Offeror shall perform the non-reoccurring engineering and tooling design required for items 4, 5, 6 if needed.
R2The Offeror shall produce first articles per Table 1 for Battelle evaluation.
R3The Offeror may propose multiple production techniques for evaluation.
R4The Offeror shall present the tooling prior to first article fabrication, as required per Section II Products under Sub Section D – Submittals.
R5The Offeror shall ship Battelle intermediate product according to Table I. Each component shall be individually vacuum sealed and packaged per the associated drawings.
R6Product Dimension and Tolerance as required on drawings.
R7Surface to be smooth and free from pits, dents, scratches, cuts and foreign material.
R8Break all sharp corners unless otherwise specified.
R9The items shall be packaged in 4,000 lb maximum fiber-enclosed skids with wooden sides and battens.
R10Each plate and sheet shall be marked per drawing unless otherwise agreed upon by Battelle.
R11The Offeror shall present their tooling design and results of simulations prior to fabrication of tooling.
R12Material certification via PDF a) From an accredited ISO/IEC Standard 17025:2017 laboratory.
R13Certificate of Conformance for all items.
R14The Offeror shall provide for Battelle’s approval any non-conformances that occur at any step of the processing.
R15The Offeror shall develop HOLD POINTS a. The Offeror shall not proceed with fabrication of the intermediate products until the tooling design is presented.
R16It is strongly preferred that the Offeror has an established and maintained National Aerospace and Defense Contractors Accreditation Program certification.
R17It is the responsibility of the Offeror to certify its size on the Representations and Certifications in their proposal.
R18Proposal shall include: • Technical Proposal o Provide a capability statement that describes the companies abilities to complete the proposed project. • Price Proposal o Provide a firm-fixed-price proposal which includes unit price, extended price, and lead time for each item. • Other Submittals: o Completed attached Representations and Certifications - Domestic.
R19Offeror is required to provide certification of the Buy American Act as part of its proposal by completing the Buy American Act Certificate in the Battelle Representations and Certifications form provided.
R20The Contractor shall maintain a quality program/system that complies with a national or international program (e.g., NQA-1, ISO-9001, ISO/IEC 17025) as identified in the statement of work or specification in effect on or before the contract date. The Contractor shall perform all work and deliver the items or services specified in compliance with its QA program/system.
R21The Contractor shall provide the following documentation upon request: • A copy of the organization's current certification (e.g., NQA-1, ISO-9001) or accreditation by an accrediting body recognized by a national or international standard (e.g., International Organization for Standardization [ISO], Global Accreditation Cooperation Incorporated (GAC or GLOBAC) (formerly International Accreditation Forum [IAF] and International Laboratory Accreditation Cooperation [ILAC] Mutual Recognition Arrangement [MRA] [e.g., A2LA, ANAB, IAS, NVLAP, PJLA]). or • If no certification or accreditation, copies of (or access to) manuals, plans and instructions/procedures that implement the QA program/system governing the product(s) or service(s) to be provided.
R22FAR 52.246-26 Reporting of Nonconforming Items (Nov 2021) shall be applicable to this Contract except for services or supplies meeting the requirements of Paragraph (g)(1)(iii) and (g)(2). Contractor shall notify Battelle when it issues a GIDEP report pursuant to this clause.
R23Right of access shall be applicable to this Contract. Upon request, Contractor shall provide Battelle access to the Contractor's (and subtier Supplier's) facilities and records for surveillance, inspection, or audit by Battelle, its designated representative, and others authorized by Battelle.
R24The Contractor must notify Battelle Contracts Specialist of any conditions that adversely impacts the Contractor's ability to maintain their quality system and, if applicable, the scope of accreditation.
R25The Contractor shall submit a Certificate of Conformance containing the following: 1. nomenclature and part number 2. as applicable, reference to codes and/or standards including revision. 3. any changes, waivers, or deviations applicable to the subject material or equipment must be approved by Battelle and documented on the certificate. 4. any procurement requirements that have not been met, including an explanation and the means for resolving the nonconformance. 5. any other information required by the specification(s) stated in this contract (e.g., specification, statement of work, and/or drawing).
R26Each report shall be legible, reproducible, and contain, in addition to any other requirements as specified by this contract, the following: 1. Battelle's contract number 2. Traceability between the item(s) received and the documentation. This is achieved through a unique identifier and includes but is not limited to, the use of serial, lot, batch, heat, or mill number 3. The signature or initials, date (month/day/year), and function of the individual accepting responsibility for the content of the test report. The person signing must be responsible for this quality function and the function and role must be described in the Contractor's Quality Assurance program.
R27Contractor shall submit a Functional Test Report(s) specifying: 1. the actual test results 2. what was tested 3. requirements/parameters tested 4. the acceptance criteria, all as required by this contract. Each report shall be legible, reproducible, and contain, in addition to any other requirements as specified by this contract, the following: 1. Battelle's contract number 2. Traceability between the item(s) received and the documentation. This is achieved through a unique identifier and includes but is not limited to, the use of serial, lot, batch, heat, or mill numbers 3. The signature, date, and function of the individual accepting responsibility for the content of the report including clear identification if an electronic signature is used.
R28Contractor shall submit a Certified Material Test Report(s) specifying: 1. American Society for Testing and Materials (ASTM) or American Society of Mechanical Engineers (ASME) Certification 2. certifying the actual results of all tests and inspections required by ASTM/ASME Standard Specification(s) stated in this contract (e.g., specification, statement of work, and/or drawing) 3. any other information required by the specification(s) stated in this contract (e.g., specification, statement of work, and/or drawing)
R29The Contractor shall mark item with a unique identification, including the part or catalog number and any applicable revision letter/number or serial number.
R30The Contractor shall purchase and maintain during the term of this Contract, at its own expense, and any extensions thereof, insurance in amounts reasonable and customary for the industry in which Contractor is engaged. Contractor shall maintain all insurance which is required by any law, statute, ordinance, or regulation of any jurisdiction having authority in whole or in part over the Contractor's operations or Contract activities, including without limitation any non-U.S. jurisdictions. Nevertheless, the following minimum insurance coverage shall be maintained: 1. Workers Compensations: Statutory 2. Employers' Liability: $100,000 per occurrence 3. Commercial General Liability (including contractual and products and completed operations liability): $1,000,000 per occurrence 4. Business Auto Liability (to include bodily injury and property damage liability covering the operation of all autos owned and unowned used in connection with performance of Contract): $1,000,000 single limit 5. Professional Liability: To the extent the Contract requires professional services to be rendered with a minimum per occurrence limit of $1,000,000 6. Any additional insurance which may be reasonably required by Battelle or the Department of Energy
R31Contractor shall submit its invoice at the time of final shipment or final completion of the services. Invoices shall reference the Battelle Purchase Order number, identify any separately payable taxes, and include a complete description of the ordered items, prices, ship dates, location of any services and other documentation as required by the Contract Schedule or Purchase Order. Invoices should be sent electronically to ap.invoices@pnnl.gov.
R32Offerors shall not include banking information in any part of their proposal/submittal(s).
R33Offeror must have an approved registration in the PNNL Vendor Portal to be awarded a Contract with PNNL.
R34INDIVIDUALLY VACUUM SEAL PARTS INDIVIDUALLY IN 5MIL MYLAR BAGS OR BUYER APPROVED EQUAL.
R35ADD SAP NUMBER AND SERIAL NUMBER TO EACH SEALED BAG WITH A 1 X 3 HARSH ENVIRONMENT THERMAL TRANSFER LABEL OR BUYER APPROVED EQUAL.
R36ELECTROCHEMICALLY ETCH OR LASER ENGRAVE PARTS WITH SAP NUMBER, LOT, AND SERIAL NUMBER 0.13” HIGH AND NO MORE THAN 0.002" DEEP. FORMAT IS: 10 DIGIT SAP NUMBER - 5 DIGIT LOT NUMBER-8 DIGIT SERIAL NUMBER (XXXXXXXXXX-XXXXX-XXXXXXXX) OR BUYER APPROVED EQUAL
R37RINSE WITH DEIONIZED WATER TO REMOVE CHIPS AND OTHER CONTAMINANTS, FOLLOWED BY A WIPE WITH DENATURED ALCOHOL

Recent awards in NAICS 332999

The newest federal contract awards in the same industry code from Department of Energy, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-06-10VPRIME TECH INCDepartment of Energy · REPLACMENT TRENCH COVERS FOR VFO SUB$77,932
2026-05-27AMERICAN BADGE INCDepartment of Energy · PURCHASE OF SPECIAL AGENT SHIELDS AND BELT BADGES$32,955
2026-05-08ATLANTIC DIVING SUPPLY, INC.Department of Energy · WNMO UTV REPLACEMENTS (GERING AND CASPER OFFICES)$80,914
2026-03-24GLOBAL ASSETS INTEGRATED LLCDepartment of Energy · CALL ORDER IN SUPPORT OF OST FOR THE PURCHASE AND DELIVERY OF NON-EXPLOSIVE BREACHING MATERIALS TO INCLUDE, BREACHING TOOLS, EXPENDABLE BREACHING MATERIALS, AND WARRANTY. TOOLS WOULD INCLUDE BUT NOT L$16,398
2026-01-27RED HILL VENTURES LLCDepartment of Energy · EYEWASH STATION AND BLADDER REFILLS$28,078
2025-08-18ATLANTIC DIVING SUPPLY, INC.Department of Energy · 3-UTILITY TASK VEHICLES$92,340

Source: USAspending.gov, retrieved 2026-10-28. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.